Plant expansions

Plant expansions: new bays, same plant, no shutdown

An expansion has to meet a building that already exists and a plant that keeps producing. The new steel ties into the old frame, matches its roof and walls, and arrives in the order the US contractor can erect it around live operations. Our plant fabricates 2,500 t of structural steel a month, so a large expansion runs as one order shipped by phase.

Site plan · add a phase

EXISTING NEW BAYS SIDE AISLE NEW BUILDING

The building as it stands today. We start from the as-built drawings or the contractor’s survey of it.

The end wall comes off and new bays continue the same frame, eave and roof slope.

A lean-to or a new span along the long wall, with a valley or a step in the roof.

A separate building linked by a covered connector, with its own frame and its own permit set.

Large-project capacity

A big expansion is one order, shipped phase by phase

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

Before we design

Six questions about the building that is already there

Lay the new plan over the old one and these come up every time. Answering them early is what keeps an expansion from turning into a field fix.

Aerial view of the long Brotex yarn factory buildings in Tay Ninh, Vietnam, framed by World Steel
  • Do as-built drawings exist?

    If not, the contractor surveys the existing frame: column lines, eave height, roof slope and member sizes.

  • Can the existing frame take new loads?

    New snow drift, wind or crane loads on the old building are checked by your Engineer of Record before we design the tie-in.

  • Was the end wall built to be removed?

    An expandable end wall comes off cleanly. A bearing end wall needs a new frame line first.

  • Do the eave, slope and panels match?

    We match eave height, roof slope, girt and purlin spacing and panel profile, so the joint does not leak.

  • What has to keep running?

    Production, fire exits and truck routes set the erection sequence, and we ship and mark the steel to it.

  • Will there be another phase?

    If so, the new end wall is designed to come off too, and the drawings say so.

From our project files

Long-bay factories planned to grow

The Brotex yarn factory in Tay Ninh is a long-bay industrial building where future expansion has to be planned from day one. GPPD Energy, JRI and Interlink show new frames rising on sites that keep working.

See the Brotex project
Long run of steel frames in the Brotex yarn factory before cladding Photo
Aerial view of new steel frames rising next to finished buildings at the GPPD Energy site Photo
Blue steel frames of the JRI new factory in Thailand during erection Photo
Interior of the Interlink factory with blue frames and roof sheeting Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • New frame, tie-in and end-wall steel designed to match the existing building
  • Erection sequence, marking and shipping by phase around the running plant
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • The survey of the existing building and the check of its frame for new loads
  • Foundations, demolition of the old end wall and temporary weather protection
  • Erection, roofing and wall tie-ins, keeping the plant running safely

Questions from US contractors

Plant expansion steel: questions and answers

6 answers, grouped by topic.

Tie-in to the existing building 3 answers

Can you match a building another fabricator supplied?

Usually, yes. From the as-built drawings or a survey we match the eave height, roof slope, girt and purlin spacing and panel profile, and design the tie-in details.

Who checks the existing frame for new loads?

Your Engineer of Record. Snow drift against a taller addition, new wind or crane loads on the old frame are checked before we design the new steel.

What is an expandable end wall?

An end wall framed so it can come off later without a new frame line. We design new end walls that way when another phase is planned.

Phasing around production 3 answers

Can the steel ship in phases?

Yes. Members are marked and packed by phase and erection sequence, so the contractor opens only the containers for the area being built.

How large an expansion can you supply?

The plant fabricates 2,500 t of structural steel a month, so a large expansion runs as one order shipped phase by phase.

Can you plan the first building for a later expansion?

Yes. We can design the first phase with expandable end walls, extra roof capacity or crane brackets for later, when the owner tells us what may come next.

Keep reading

Related pages

Price it or partner with us

Send the existing drawings and the new layout.

Share the as-built drawings or a survey, the expansion plan and what must keep running. We will design the tie-in and price the steel by phase.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →