Large-project capacity
A big expansion is one order, shipped phase by phase
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
| Project | Sector | Where | Structural steel |
|---|---|---|---|
| Sunpro Steel Factory | Steel industry | Can Tho City, Vietnam · 2024 | 5,000 t |
| CPV Food Processing Factory | Food processing | Dong Nai Province, Vietnam · 2020 | 2,500 t |
| Long Son petrochemical | Oil and gas | Ba Ria–Vung Tau, Vietnam · 2022 | 2,000 t |
| M&D warehouse, Thailand | Warehouse and industrial | Thailand · 2024 | 2,000 t |
| Tongwei feed factory, phase 1 | Animal feed | Dong Thap Province, Vietnam · 2018 | 1,500 t |
| New Era cold storage, phase 1 | Cold storage, phase 1 tonnage | Tay Ninh Province, Vietnam | 1,000 t |
Before we design
Six questions about the building that is already there
Lay the new plan over the old one and these come up every time. Answering them early is what keeps an expansion from turning into a field fix.
Do as-built drawings exist?
If not, the contractor surveys the existing frame: column lines, eave height, roof slope and member sizes.
Can the existing frame take new loads?
New snow drift, wind or crane loads on the old building are checked by your Engineer of Record before we design the tie-in.
Was the end wall built to be removed?
An expandable end wall comes off cleanly. A bearing end wall needs a new frame line first.
Do the eave, slope and panels match?
We match eave height, roof slope, girt and purlin spacing and panel profile, so the joint does not leak.
What has to keep running?
Production, fire exits and truck routes set the erection sequence, and we ship and mark the steel to it.
Will there be another phase?
If so, the new end wall is designed to come off too, and the drawings say so.
From our project files
Long-bay factories planned to grow
The Brotex yarn factory in Tay Ninh is a long-bay industrial building where future expansion has to be planned from day one. GPPD Energy, JRI and Interlink show new frames rising on sites that keep working.
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- New frame, tie-in and end-wall steel designed to match the existing building
- Erection sequence, marking and shipping by phase around the running plant
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- The survey of the existing building and the check of its frame for new loads
- Foundations, demolition of the old end wall and temporary weather protection
- Erection, roofing and wall tie-ins, keeping the plant running safely
Questions from US contractors
Plant expansion steel: questions and answers
6 answers, grouped by topic.
Tie-in to the existing building 3 answers
Can you match a building another fabricator supplied?
Usually, yes. From the as-built drawings or a survey we match the eave height, roof slope, girt and purlin spacing and panel profile, and design the tie-in details.
Who checks the existing frame for new loads?
Your Engineer of Record. Snow drift against a taller addition, new wind or crane loads on the old frame are checked before we design the new steel.
What is an expandable end wall?
An end wall framed so it can come off later without a new frame line. We design new end walls that way when another phase is planned.
Phasing around production 3 answers
Can the steel ship in phases?
Yes. Members are marked and packed by phase and erection sequence, so the contractor opens only the containers for the area being built.
How large an expansion can you supply?
The plant fabricates 2,500 t of structural steel a month, so a large expansion runs as one order shipped phase by phase.
Can you plan the first building for a later expansion?
Yes. We can design the first phase with expandable end walls, extra roof capacity or crane brackets for later, when the owner tells us what may come next.
Keep reading
Related pages
Price it or partner with us
Send the existing drawings and the new layout.
Share the as-built drawings or a survey, the expansion plan and what must keep running. We will design the tie-in and price the steel by phase.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024