Walk through any steel building site in California, Washington or Utah and you will see diagonal braces: X-patterns in the exterior walls of warehouses, chevrons in office building cores, two-storey X braces in hospitals and labs. The concentrically braced frame is the most widely used seismic system in steel, because it is stiff, efficient in tonnage and simple to fabricate. AISC 341-22 Chapter F covers two versions: the ordinary concentrically braced frame (OCBF) in Section F1 and the special concentrically braced frame (SCBF) in Section F2. The 2022 edition made a notable change for V-braced SCBF beams. This article explains both systems and how they differ.
How a concentrically braced frame works
In a concentrically braced frame, diagonal braces meet the beams and columns at, or close to, a common point, so the frame resists lateral load mainly by axial forces: braces in tension and compression, columns in axial load, beams carrying the horizontal component between braces. The frame is far stiffer than a moment frame, so drift rarely governs.
In a strong earthquake, the braces do the yielding. A brace in tension stretches; a brace in compression buckles, bending sideways and forming a plastic hinge at its mid-length. Then the load reverses, and the roles swap. The energy dissipated in those cycles is what lets the frame survive. The challenge is that buckling braces lose compression strength with each cycle, and their mid-length hinges and end connections see intense strain. Chapter F is written around that behavior.
R factors in ASCE 7
| System | R | Ω0 | Cd | AISC 341 section |
|---|---|---|---|---|
| Special concentrically braced frame (SCBF) | 6 | 2 | 5 | F2 |
| Ordinary concentrically braced frame (OCBF) | 3.25 | 2 | 3.25 | F1 |
ASCE 7 sets height limits for both in the higher Seismic Design Categories, with OCBF far more restricted. SCBF is the usual braced system for mid-rise buildings in high-seismic regions.
Ordinary concentrically braced frames: Section F1
An OCBF is expected to provide limited inelastic deformation in its braces and connections. It is designed for a higher force and asked to do less:
- Brace connections are designed for the expected tensile strength of the brace, Ry Fy Ag, or for the overstrength load, whichever the standard permits as the lesser, so the connection does not fail before the brace yields.
- V-type and inverted-V-type configurations have a brace slenderness limit and require the beam to carry the unbalanced force from the braces where the standard applies.
- K-type bracing, where braces meet a column at mid-height, is not permitted, because a buckled brace would leave the column with an unbalanced lateral load.
- Braces meet moderately ductile width-to-thickness limits in some configurations.
OCBF suits low buildings in moderate seismic regions and light industrial structures where the higher design force is not a burden.
Special concentrically braced frames: Section F2
An SCBF is expected to provide significant inelastic deformation capacity, mainly through brace buckling and yielding in tension. Section F2 builds a complete capacity design around that.
Braces
- Slenderness: brace slenderness Lc/r is limited to 200.
- Ductility: braces must be highly ductile under Table D1.1, so the brace wall or flange does not buckle locally at the mid-length hinge, a classic cause of brace fracture, especially in HSS.
- Built-up braces: when braces are made of two angles or channels, stitches are spaced so the individual elements do not buckle between them, and stitches are not placed in the middle quarter of the brace length.
- Distribution: along any line of braces, the braces must be arranged so that neither tension braces nor compression braces carry almost all of the lateral force in either direction; in practice, braces are placed in opposing pairs.
- No tension-only and no K-bracing. All SCBF braces work in tension and compression.
Analysis with braces at expected strength
Section F2.3 requires the frame members other than braces, beams, columns and connections, to be designed for the larger of two analyses: one with all braces at their expected strength in tension and compression, and one with braces in tension at expected strength and braces in compression at their post-buckling strength, a fraction of the expected buckling strength. The second analysis captures what happens after several cycles, when the compression braces have lost much of their capacity and the tension braces pull hard.
Brace connections
Brace connections are designed for:
- Tension: the expected yield strength of the brace, Ry Fy Ag.
- Compression: the expected buckling strength of the brace, with a factor for the increase in strength above nominal.
- Rotation: either the connection is designed for the brace's expected flexural strength, or, more commonly, it must accommodate the brace end rotation as the brace buckles.
The rotation is usually handled by the gusset plate. For braces that buckle out of plane, the gusset must bend along a line, so AISC 341 requires a clear band, at least twice the gusset thickness, between the end of the brace and the line where the gusset is restrained by the beam or column. Alternative elliptical clearance details and in-plane buckling details are also recognized.
Columns and beams
SCBF columns must be highly ductile and designed for the forces from the two analyses, and column splices are designed for substantial shear and flexure. Beams must be moderately ductile and carry the forces from the braces, including the horizontal components and, in V-type frames, the unbalanced vertical force.
V-braced beams: the 2022 change
In V-type and inverted-V-type (chevron) SCBF, two braces meet the beam at mid-span. While both braces are intact, their vertical forces roughly cancel. Once the compression brace buckles and loses strength while the tension brace keeps pulling, a large unbalanced vertical force acts on the beam at mid-span.
Earlier editions required the beam to resist that force essentially elastically, which often led to very heavy beams. AISC 341-22 formally permits limited yielding of the beam under the unbalanced load, within the conditions the standard sets, recognizing research showing that controlled beam yielding does not harm the frame's performance and can even improve it by spreading damage. For fabricators and owners, the practical effect is lighter beams in chevron frames, with the beam bracing and connection rules adjusted to suit.
Protected zones
In an SCBF, the protected zones include the middle portion of each brace, where the plastic hinge forms when it buckles, the regions next to each brace connection, and the elements of the connection that yield, such as the gusset hinge band. No attachments, welds or holes are allowed there except as the standard permits.
Multi-tiered braced frames
Tall single-storey spaces, such as warehouses, hangars, sports halls and industrial buildings, often use multi-tiered braced frames: two or more tiers of braces stacked within one storey, with struts between tiers but no floor. AISC 341 has provisions for multi-tiered OCBF and SCBF that address the risk of yielding concentrating in one tier and bending the columns between tiers. Column design for in-plane bending and torsional bracing at the tier levels are key.
Choosing a bracing configuration
The geometry of the braces affects how an SCBF behaves and what it costs:
| Configuration | Behavior | Practical notes |
|---|---|---|
| Single diagonal | One brace per bay; must be paired with an opposite diagonal elsewhere in the line | Simple, but distribution rules apply |
| X-bracing across one storey | Braces cross at mid-length; the tension brace braces the compression brace | Common in walls; connection at the crossing needs care |
| Two-storey X | Braces meet the beam at mid-span every other floor, forming an X over two storeys | Reduces unbalanced beam forces compared with chevrons |
| Chevron (inverted V) | Two braces meet the beam from below at mid-span | Allows doors and corridors under the beam; beam carries the unbalanced load |
| V-type | Two braces meet the beam from above | Similar to chevron, used less often |
Many US designers favor the two-storey X for mid-rise buildings, because the unbalanced load at the shared beam is far smaller than in a chevron at every floor. The 2022 permission for limited beam yielding makes chevrons more competitive where openings are needed.
Fabrication notes
- HSS braces are cut, slotted and fitted with gussets; slot ends and net section reinforcement follow the design so the brace yields before its net section fractures.
- Gussets are laser cut with the clearance band dimension marked on the drawings.
- Welds joining gussets to beams and columns are designed for the brace's expected strength; many are demand critical depending on the system.
- Protected zones at brace mid-length are kept clear of erection aids and attachments.
How World Steel designs and fabricates concentrically braced frames
World Steel designs and fabricates OCBF and SCBF steel for US warehouses, industrial plants and multi-storey buildings in its own IAS AC472-accredited plant in Vietnam. We design brace connections for expected strength, check the two SCBF analyses, size gussets with the required clearance band and take advantage of the 2022 provisions for V-braced beams where the Engineer of Record agrees. Gusset plates and bracing connections are cut on laser machines that handle steel up to 100 mm thick, and HSS and wide-flange braces are fabricated and welded by welders qualified to AWS D1.8.
Protected zones and gusset clearance bands are shown on the shop drawings, included at no extra cost, and each brace can be followed in PEB Studio. The Engineer of Record reviews and approves the design, and the US contractor, our customer, sets the braces on site.
The next article looks at the braced frame that yields in a different place: the eccentrically braced frame and its link.
Quick answers
What is the difference between OCBF and SCBF?
An ordinary concentrically braced frame (OCBF), R = 3.25, is designed for higher forces and expects limited brace yielding. A special concentrically braced frame (SCBF), R = 6, expects braces to buckle and yield repeatedly, so it needs highly ductile braces, capacity-designed connections and gusset details that allow brace end rotation.
Why do SCBF gussets have a clear distance from the brace end?
When a brace buckles out of plane, the gusset must bend. A clear band, at least twice the gusset thickness, between the brace end and the line of restraint lets the gusset form a hinge without tearing.
What changed for V-braced SCBF beams in 2022?
AISC 341-22 permits limited yielding of the beam in V-type and inverted-V-type SCBF under the unbalanced load that develops when a brace buckles, instead of requiring the beam to remain fully elastic.
Are tension-only braces allowed in SCBF?
No. SCBF braces must work in both tension and compression, and K-type bracing is not permitted. Tension-only rod bracing is used in other systems, such as some ordinary frames and metal buildings, within ASCE 7 limits.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


