Steel and concrete have complementary strengths. Concrete is stiff, cheap in compression and good at stopping steel from buckling. Steel is ductile, strong in tension and fast to erect. Composite seismic systems put the two together so each covers the other's weaknesses. AISC 341-22 has two chapters for them: Chapter G for composite moment frames and Chapter H for composite braced frames and shear walls. The 2022 edition adds a new system to Chapter H that is changing how tall buildings are built, the coupled composite plate shear wall, concrete filled (CC-PSW/CF), and updates the rules for composite walls with steel coupling beams. This article walks through the composite systems with the composite plate shear wall at the center.
Why composite systems
Composite construction is already everywhere in steel buildings: concrete slabs on metal deck with shear studs, acting with steel beams. In seismic systems, composite action goes further:
- Encased columns, steel shapes wrapped in reinforced concrete, gain stiffness and fire resistance.
- Filled columns, steel tubes or boxes filled with concrete, gain axial strength while the concrete prevents the steel wall from buckling inward.
- Composite walls combine steel plates and concrete to resist very large shear in a thin section.
Chapters G and H take the AISC 341 principles of capacity design, ductility and protected zones and apply them to these mixed members, with the concrete side coordinated with ACI 318.
Chapter G: composite moment frames
Chapter G covers four systems that mirror the steel moment frames of Chapter E:
- C-OMF and C-IMF, composite ordinary and intermediate moment frames, with steel or composite beams framing into encased or filled composite columns, for moderate ductility demands.
- C-SMF, composite special moment frames, with strict detailing at the beam-to-column joints, including the reinforcement and ties in encased columns, so the frame can sustain large drifts.
- C-PRMF, composite partially restrained moment frames, where the connections are semi-rigid and the composite slab contributes to the connection's moment resistance, using the flexibility of the composite floor.
Composite moment frames are common where concrete-filled tube columns are used for their axial capacity and speed, or where encased columns are needed for fire or architectural reasons.
Chapter H: composite braced frames and walls
Chapter H covers a wider family:
| System | What it is |
|---|---|
| C-OBF | Composite ordinary braced frame |
| C-SCBF | Composite special concentrically braced frame |
| C-EBF | Composite eccentrically braced frame |
| C-OSW | Composite ordinary shear wall: reinforced concrete walls with steel or composite elements, such as steel coupling beams |
| C-SSW | Composite special shear wall: the same, with special detailing |
| C-PSW/CE | Composite plate shear wall, concrete encased: a steel plate with reinforced concrete on one or both sides |
| C-PSW/CF | Composite plate shear wall, concrete filled: two steel faceplates tied together and filled with concrete |
| CC-PSW/CF | Coupled composite plate shear wall, concrete filled: C-PSW/CF wall piers linked by composite coupling beams (new in 2022) |
In composite braced frames, braces or columns may be encased or filled; the concrete helps prevent overall and local buckling. In composite walls, the steel and concrete share the shear.
The new system: CC-PSW/CF
How it is built
Each wall pier in a CC-PSW/CF is a steel box: two steel faceplates, one on each face of the wall, held a fixed distance apart by tie bars that cross the wall at a regular spacing. The box is assembled in modules, shipped, erected with the steel frame and then filled with concrete. The faceplates act as the formwork and the reinforcement at once; the tie bars keep the plates from bulging during the concrete pour and from buckling outward later.
The piers are linked across door openings by composite coupling beams, typically steel boxes filled with concrete, connected to the faceplates of the piers on either side. The coupling beams are the designed fuses: in a major earthquake, they yield first, in a controlled way, dissipating energy while the wall piers continue to carry the building.
Why it matters
The CC-PSW/CF addresses one of the biggest schedule bottlenecks in tall buildings: the concrete core. A conventional reinforced concrete core around the elevators and stairs is built floor by floor, with rebar tied by hand and formwork jumped up, and the steel frame often waits for it. With CC-PSW/CF, the core walls are steel modules that rise in parallel with the steel frame, and concrete filling follows a few floors behind. The system resists very large shear and overturning moments in a thin wall, which suits tall towers.
The system, known commercially as SpeedCore, was used on the Rainier Square Tower in Seattle, where the core rose far faster than a conventional concrete core, and its research and testing led to its inclusion in AISC 341-22.
Design rules in brief
AISC 341-22 sets the CC-PSW/CF requirements for:
- Faceplate slenderness, limited relative to the tie bar spacing so the plates do not buckle locally.
- Tie bar size and spacing.
- Wall pier flexural and shear strength, using composite section behavior.
- Coupling beams, with their own slenderness limits, flexural and shear strength, and a connection to the wall piers designed to develop the beam's expected strength.
- Capacity design, so the coupling beams yield before the wall piers, and the piers yield only at their base.
- Protected zones in the coupling beam yielding regions and the pier base.
Updated: C-OSW and C-SSW coupling beams
Not every composite wall is a steel box. Many tall buildings use reinforced concrete core walls with steel coupling beams embedded into the walls across door openings. The 2022 edition updated two topics for these composite ordinary and special shear walls:
- Embedment length: the calculation of how far the steel coupling beam must extend into the concrete wall to develop its strength was standardized, so different designers get consistent results.
- Transfer reinforcement: new provisions require local reinforcement, including ties and transfer bars, in the embedment region. They prevent the concentrated bearing forces from the steel beam from breaking out or spalling the concrete face of the wall, a failure seen in tests.
Choosing among composite wall systems
For a tall building core, the Engineer of Record usually compares three options:
- A reinforced concrete core with steel coupling beams (C-OSW or C-SSW). Familiar to concrete contractors and economical where the core can be built ahead of the steel. The updated embedment and transfer reinforcement rules apply at every coupling beam.
- A composite plate shear wall, concrete encased (C-PSW/CE). A steel plate inside a concrete wall, giving a thinner wall than plain concrete with steel's ductility, but still needing formwork and reinforcement on site.
- A coupled composite plate shear wall, concrete filled (CC-PSW/CF). The thinnest and fastest option for the core, with no formwork or rebar cage, but with more steel and a fabrication-intensive module.
The choice depends on height, schedule, the local labor market for concrete and steel trades, floor area value and the contractor's experience. On tall towers where every week of schedule carries a large financing cost, the speed of CC-PSW/CF can outweigh the higher steel tonnage.
What the 2022 additions mean for the market
With CC-PSW/CF now written into AISC 341-22, project teams have a standard set of design and detailing rules to work from, instead of relying only on project-specific research and testing, and building officials have a published basis for review. Expect to see it more often on towers in the Pacific Northwest and California, and on mid-rise buildings where a steel core module can be fabricated and shipped as a package with the rest of the frame.
Fabrication and coordination notes
Composite systems demand close coordination between the steel fabricator, the concrete contractor and the Engineer of Record:
- Shear studs and tie bars must be placed exactly as designed; they transfer force between steel and concrete.
- Faceplate modules for CC-PSW/CF are fabricated to tight tolerances, with tie bars welded or bolted through the plates, and with splices between modules designed for the wall forces.
- Concrete placement inside filled members needs vent holes, access and a sequence that the steel design anticipates.
- Embedded steel coupling beams need reinforcement layouts coordinated with the beam's studs, stiffeners and bearing plates.
- Fire resistance of exposed faceplates is addressed by the project's fire protection design.
How World Steel supports composite seismic systems
World Steel designs and fabricates the structural steel for composite systems in US projects in its own IAS AC472-accredited plant in Vietnam: encased steel shapes, concrete-filled box columns and box coupling beams, steel coupling beams with studs and bearing plates, and plate assemblies, made as built-up steel sections from plate cut on laser machines that handle steel up to 100 mm thick. Our welded box columns and box girders use the same plate fabrication, welding and dimensional control that composite modules need, and our welders are qualified to AWS D1.8.
We show studs, tie bars, vent holes, splices and protected zones on the shop drawings, coordinate with the Engineer of Record on the steel-concrete interfaces, and track every module in PEB Studio. The Engineer of Record reviews and approves the design, and the US contractor handles erection and concrete placement on site.
The next article turns from design to execution: fabrication, erection, quality control and quality assurance under Chapters I and J.
Quick answers
What is CC-PSW/CF?
The coupled composite plate shear wall, concrete filled, is a system new to AISC 341-22. Two or more wall piers, each made of steel faceplates tied together and filled with concrete, are linked by ductile composite coupling beams. It resists very large shear and overturning in tall buildings.
Why is CC-PSW/CF faster to build than a concrete core?
The steel faceplate modules act as permanent formwork and reinforcement, so the core rises with the steel frame and is filled with concrete afterwards. There is no rebar cage to tie and no formwork to cycle for the core walls.
What changed for C-OSW and C-SSW?
AISC 341-22 standardized how the embedment length of steel coupling beams in reinforced concrete walls is calculated and requires local transfer reinforcement in the embedment region to prevent concrete breakout and spalling.
Which composite moment frames are in Chapter G?
Composite ordinary, intermediate and special moment frames (C-OMF, C-IMF, C-SMF) and composite partially restrained moment frames (C-PRMF).
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- US codes and standardsIBC, AISC, AWS and MBMA, designed to
- Seismic steel structuresSDC D to F framing for West Coast jobs
- Crane building designUS crane standards for mill and bay buildings
- Design ReportWhat our US-code design report contains
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors


