Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Smith’s · Parish

Steel buildings and structural steel for Smith’s Parish, Bermuda

Smith’s Parish lies between the south shore and Harrington Sound, with Spittal Pond nature reserve, John Smith’s Bay and part of Flatts Village.

The east end · Main settlement Flatts Village

Main settlement
Flatts Village
Group
The east end
Main towns
Flatts Village, Spittal Pond, John Smith’s Bay
Port
Port of Hamilton

Site conditions in Smith’s

What the site asks of your steel

Wind
South shore exposure
Air
Atlantic spray
Ground
Limestone
Access
Narrow roads

Our design note. Smith’s needs homes, halls and small commercial buildings near an exposed coast. Wind design and marine coatings fit the parish.

Smith’s at a glance

The ground, the work and the road in

Ground and climate

Limestone hills, south shore cliffs and the sound shore.

What gets built

Housing, community services and small businesses.

Getting steel there

About fifteen minutes by road from the port of Hamilton.

Towns: Flatts Village · Spittal Pond · John Smith’s Bay

Steel we recommend

What we fabricate for Smith’s

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Offices and retail

Office buildings, shops and mixed-use blocks.

Commercial steel buildings →

Hotels and resorts

Hotel buildings, resort cottages, restaurants and spa roofs.

Multi-story steel buildings →

Contractors in Smith’s

You win the job in Smith’s. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Smith’s

Can you supply community halls?

Yes. Halls designed to the risk category your engineer sets.

Is the south shore harder on steel?

Yes. Exposed steel gets stronger systems or galvanizing.

The east end

Other parishes: the east end

Smith’s, Hamilton Parish and St George’s: Harrington Sound, the airport and the old Town of St George.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Bermuda. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Bermuda

Talk to us about steel for Smith’s

Send the drawings or the site, size and use. We design or detail the steel for Smith’s’s hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Hamilton. WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.