Bermuda · Ground

Limestone ground, caves and foundations for steel in Bermuda

Bermuda is a cap of limestone, built from wind-blown sand over an old volcanic seamount. The rock varies from soft to hard, caves run through it, especially around Harrington Sound, and marshes such as Pembroke and Devonshire hold soft peat. Slopes are steep and sites are tight. Seismic hazard is low, so the steel design is led by wind and by the foundation reactions your engineer needs.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Hamilton.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Ground
Aeolian limestone
Caves
Around Harrington Sound
Marsh
Peat in Pembroke, Devonshire
Seismic
Low hazard

Ground types

What lies under the site

Your geotechnical engineer confirms the ground for each site.

AreaTypical groundWhat it means for steel
Hills and ridgesLimestone, soft to hardShallow foundations, rock anchors where needed
Cave areas, Hamilton ParishLimestone with voidsVoid checks by your engineer before foundations
Pembroke and Devonshire marshesPeat and soft soilsPiles or ground improvement by site
Reclaimed waterfrontFill over marine sedimentsDeeper foundations and settlement checks

Frames

How we detail for the ground and the wind

Moment frames

Portal and multi-bay frames for warehouses, halls and hangars.

Braced frames

Efficient bracing for offices, hotels and apartments.

Base plates and anchors

Base plates sized for wind uplift and shear.

Column reactions

Clear reactions for each load case, ready for your foundation design.

Who does what

Ground work, split clearly

World Steel supplies

  • Column reactions for the foundation design
  • Base plates, anchor bolt plans and templates
  • Frames designed for the loads your engineer sets
  • Plate with EN 10204 3.1 certificates on request
  • Remote or in-person inspector access

In Bermuda, the contractor and the engineer of record arrange

  • Geotechnical investigation and cave checks
  • Foundation design and construction
  • Rock excavation and retaining walls
  • Inspections on site
  • Erection to the drawings

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Bermuda has 9 parishes. Open Smith’s, Hamilton Parish or St George’s to see the local wind, ground and coast, the road from Hamilton and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Bermuda project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder guiding a drilled base plate hanging from a jib hoist
A drilled base plate on its way to fit-up in the Vietnam plant.

Q&A

What Bermudian buyers ask

Do caves affect a steel building?

They affect the foundations. Your engineer checks for voids; a light steel frame puts less load on the rock than concrete.

Can we build on marsh ground?

Often yes, with piles or ground improvement designed by your engineer.

Does Bermuda need seismic design?

Hazard is low. Your engineer applies the code values; wind usually governs the steel.