Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Warwick · Parish

Steel buildings and structural steel for Warwick Parish, Bermuda

Warwick is a residential parish between Southampton and Paget, with Warwick Long Bay on the south shore, Riddell’s Bay on the sound side and Warwick Camp.

The centre · Main settlement Warwick

Main settlement
Warwick
Group
The centre
Main towns
Warwick Long Bay, Riddell’s Bay, Warwick Camp
Port
Port of Hamilton

Site conditions in Warwick

What the site asks of your steel

Wind
Hills and south shore
Air
Coastal salt
Ground
Limestone
Access
Narrow parish roads

Our design note. Warwick needs schools, halls, homes and small commercial buildings. Wind design on the hills and compact deliveries fit the parish.

Warwick at a glance

The ground, the work and the road in

Ground and climate

Limestone hills and south shore beaches.

What gets built

Housing, schools, community services and small businesses.

Getting steel there

About twenty minutes by road from the port of Hamilton.

Towns: Warwick Long Bay · Riddell’s Bay · Warwick Camp · Khyber Pass

Steel we recommend

What we fabricate for Warwick

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Offices and retail

Office buildings, shops and mixed-use blocks.

Commercial steel buildings →

Multi-storey buildings

Steel frames with composite deck for offices, apartments, clinics and schools.

Multi-storey steel framing →

Contractors in Warwick

You win the job in Warwick. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Warwick

Can you supply school buildings?

Yes. Classrooms and halls designed to the risk category your engineer sets.

Can you deliver on narrow parish roads?

Yes. We size members and bundles for the route.

The centre

Other parishes: the centre

Warwick, Paget, Pembroke with the City of Hamilton, and Devonshire: offices, the hospital, homes and the main port.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Bermuda. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Bermuda

Talk to us about steel for Warwick

Send the drawings or the site, size and use. We design or detail the steel for Warwick’s hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Hamilton. WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.