Project types
What we fabricate for Bermuda
Office buildings
Composite frames with long spans for open floors.
Hotels and resorts
Multi-storey frames for rooms, suites and amenities.
Healthcare
Composite frames for clinics and hospital buildings.
Schools and halls
Classrooms and halls designed to the risk category your engineer sets.
Airport buildings
Hangar and cargo frames.
Marine buildings
Boat sheds and dockyard buildings, galvanized for the harbour.
Speed
A tight site, a short programme
We fabricate while your site builds the foundations, then ship floor by floor so the site never fills up with steel. Composite deck replaces most formwork, and the building closes in fast.
Large packages are released by level or by building. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Bermuda Building Code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by level and shipping to Hamilton
- Shop and erection drawings, included
The contractor arranges
- Owner contract and permits
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Bermuda has 9 parishes. Open Smith’s, Hamilton Parish or St George’s to see the local wind, ground and coast, the road from Hamilton and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Bermuda project is cut, welded, inspected and packed.
Q&A
What Bermudian buyers ask
Can a steel frame save time on a Hamilton office building?
Yes. Members are made while foundations are built and composite deck cuts formwork, so floors go up much faster than cast concrete.
Can you deliver to a tight city site?
Yes. We release shipments level by level and plan member lengths for the roads.
Do you work with local contractors?
Yes. Contractors in Bermuda are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Bermuda solutions
Every Bermuda guide
Related pages
Code facts on this page summarize practice in Bermuda and the standards it references. They are not legal or engineering advice; your engineer of record and the Department of Planning confirm the code and edition in force for your project.
Contact World Steel · Bermuda
Talk to us about steel for Bermuda
WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.