Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St George’s · Parish

Steel buildings and structural steel for St George’s Parish, Bermuda

St George’s is the eastern parish, with the historic Town of St George, a UNESCO World Heritage Site, St David’s with L.F. Wade International Airport, and Tucker’s Town on the south shore.

The east end · Main settlement Town of St George

Main settlement
Town of St George
Group
The east end
Main towns
Town of St George, St David’s, Tucker’s Town
Port
Port of Hamilton

Site conditions in St George’s

What the site asks of your steel

Wind
Open eastern exposure
Surge
Harbours and low land
Air
Sea salt
Heritage
Historic town rules

Our design note. St George’s needs airport, hotel and marine buildings, and new buildings that respect a World Heritage town. Long spans, galvanized steel and careful planning shape the steel.

St George’s at a glance

The ground, the work and the road in

Ground and climate

Limestone islands, reclaimed land at the airport and sheltered harbours.

What gets built

The airport, tourism, marine trades, heritage and housing.

Getting steel there

About thirty minutes by road from the port of Hamilton, over the Causeway.

Towns: Town of St George · St David’s · Tucker’s Town · L.F. Wade International Airport

Steel we recommend

What we fabricate for St George’s

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hangars and terminals

Long-span frames for hangars, cargo sheds and terminal buildings.

Aircraft hangar buildings →

Hotels and resorts

Hotel buildings, resort cottages, restaurants and spa roofs.

Multi-story steel buildings →

Marinas and marine buildings

Boat sheds, ferry terminals, yacht clubs and dockyard buildings.

Coastal corrosion protection →

Contractors in St George’s

You win the job in St George’s. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St George’s

Can you supply airport buildings?

Yes. Hangar and cargo frames with doors designed into the wind case.

Can steel be used near the historic town?

Yes, as the frame behind finishes the planning rules call for. Your architect and the Department of Planning set the look.

The east end

Other parishes: the east end

Smith’s, Hamilton Parish and St George’s: Harrington Sound, the airport and the old Town of St George.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Bermuda. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Bermuda

Talk to us about steel for St George’s

Send the drawings or the site, size and use. We design or detail the steel for St George’s’s hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Hamilton. WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.