Site conditions in Pembroke
What the site asks of your steel
- Wind
- Harbour and hills
- Surge
- Harbour front
- Ground
- Limestone, fill and marsh
- Access
- Tight city sites
Our design note. Pembroke builds offices, apartments and government buildings on tight city sites. Composite floors, floor-by-floor deliveries and wind design shape the steel.
Pembroke at a glance
The ground, the work and the road in
Ground and climate
Limestone hills, reclaimed waterfront and the old Pembroke Marsh.
What gets built
International business, government, retail, the port and housing.
Getting steel there
The port of Hamilton is in the parish.
Towns: City of Hamilton · Spanish Point · North Shore · Pembroke Marsh
Steel we recommend
What we fabricate for Pembroke
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Multi-storey buildings
Steel frames with composite deck for offices, apartments, clinics and schools.
Multi-storey steel framing →Warehouses and logistics
Clear-span warehouses and stores for imported food and building supplies.
Warehouse and distribution buildings →Contractors in Pembroke
You win the job in Pembroke. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Pembroke
Can you supply office buildings in Hamilton?
Yes. Composite steel frames with long spans, delivered level by level for tight sites.
Can you supply port warehouses?
Yes. Clear-span warehouses and sheds, coated for the harbour.
The centre
Other parishes: the centre
Warwick, Paget, Pembroke with the City of Hamilton, and Devonshire: offices, the hospital, homes and the main port.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Bermuda. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Bermuda
Talk to us about steel for Pembroke
Send the drawings or the site, size and use. We design or detail the steel for Pembroke’s hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Hamilton. WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.