Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Paget · Parish

Steel buildings and structural steel for Paget Parish, Bermuda

Paget faces the City of Hamilton across the harbour, with King Edward VII Memorial Hospital, the Botanical Gardens, Elbow Beach on the south shore and homes on the hills between.

The centre · Main settlement Paget

Main settlement
Paget
Group
The centre
Main towns
Paget, Elbow Beach, Botanical Gardens
Port
Port of Hamilton

Site conditions in Paget

What the site asks of your steel

Wind
Hills and south shore
Air
Harbour and Atlantic salt
Ground
Limestone
Access
Tight hillside sites

Our design note. Paget builds healthcare, hotels and homes close to Hamilton. Composite frames, higher risk categories for healthcare and marine coatings shape the steel.

Paget at a glance

The ground, the work and the road in

Ground and climate

Limestone hills between the harbour and the south shore.

What gets built

Healthcare, hotels, housing and offices.

Getting steel there

About ten to fifteen minutes by road from the port of Hamilton.

Towns: Paget · Elbow Beach · Botanical Gardens · Hungry Bay

Steel we recommend

What we fabricate for Paget

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Multi-storey buildings

Steel frames with composite deck for offices, apartments, clinics and schools.

Multi-storey steel framing →

Hotels and resorts

Hotel buildings, resort cottages, restaurants and spa roofs.

Multi-story steel buildings →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in Paget

You win the job in Paget. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Paget

Can you supply healthcare buildings?

Yes. Composite frames for clinics and hospital buildings, designed to the risk category your engineer sets.

Can you supply hotel buildings on the south shore?

Yes. Multi-storey frames with marine coatings.

The centre

Other parishes: the centre

Warwick, Paget, Pembroke with the City of Hamilton, and Devonshire: offices, the hospital, homes and the main port.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Bermuda. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Bermuda

Talk to us about steel for Paget

Send the drawings or the site, size and use. We design or detail the steel for Paget’s hurricane and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Hamilton. WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.