Why it matters
International Code practice, Atlantic loads
Because the Bermuda code follows the International Codes, the steel design uses the same AISC and ASCE references US engineers use every day. What changes is the site: an island alone in the Atlantic, open to hurricane winds from every side.
Office, hotel and institutional owners, and the insurers many of them work with, often add their own specifications. We design to the basis your engineer of record agrees with the owner and the department, and keep it on every sheet.
Design basis
What the steel design states
The items we confirm with your engineer of record in Bermuda before modeling.
| Item | What we state |
|---|---|
| Code | The Bermuda Building Code and the editions it references |
| Wind | Basic wind speed, exposure and risk category |
| Flood | Floor levels and surge loads set by your engineer |
| Seismic | Site class and seismic values from the code |
| Steel | AISC 360 design, connections for reversing wind loads |
Who does what
Permit work, split clearly
World Steel supplies
- Steel design or detailing to the Bermuda Building Code
- Calculations and drawings for review
- Answers to plan-review comments on the steel in Bermuda
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Bermuda, the contractor and the engineer of record arrange
- Planning permission and building permit
- Geotechnical report
- Inspections on site
- Foundations
- Erection
Bermuda
What we do not claim
World Steel holds no approval, licence or registration in Bermuda and does not apply for permits. The engineer of record approves the design and your team files it with the Department of Planning.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Bermuda has 9 parishes. Open Sandys, Southampton or Warwick to see the local wind, ground and coast, the road from Hamilton and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Bermuda project is cut, welded, inspected and packed.
Q&A
What Bermudian buyers ask
Who issues building permits in Bermuda?
The Department of Planning, after planning permission. Your team files with the engineer or architect of record.
Does the Bermuda code use US standards?
It is based on the International Codes, so the IBC, ASCE 7 and AISC 360 framework applies. Your engineer of record sets the exact editions.
Do planning rules affect a steel building?
They shape the roof, the walls and the look. A steel frame can carry the finishes the rules call for, including the stepped white roof.
Bermuda solutions
Every Bermuda guide
Related pages
Code facts on this page summarize practice in Bermuda and the standards it references. They are not legal or engineering advice; your engineer of record and the Department of Planning confirm the code and edition in force for your project.
Contact World Steel · Bermuda
Talk to us about steel for Bermuda
WhatsApp, email or a video call with our engineers, booked at an hour that suits Hamilton. Our contact page for Bermuda has the ports, the local time and the form.