Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Grenada · Earthquakes and ground

Earthquake loads and volcanic ground for steel in Grenada

Grenada is an old volcanic island. Mount St Catherine rises to 840 m in the north, Grand Etang lake fills a crater in the central mountains, and Kick ’em Jenny, the most active underwater volcano in the eastern Caribbean, lies off the north coast. The Lesser Antilles subduction zone brings earthquakes. Most sites are on slopes of weathered volcanic soil; the south coast is flatter. Light, ductile steel frames suit both.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St George’s.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Seismic
Lesser Antilles arc
Offshore
Kick ’em Jenny volcano
Highest point
Mount St Catherine, 840 m
Steel design
AISC 341 where required

Ground types

What lies under the site

Your geotechnical engineer confirms the ground for each site.

AreaTypical groundWhat it means for steel
Hills and interiorWeathered volcanic soils, slopesLight frames, stepped foundations, drainage
South coast, Grand Anse to St DavidLower slopes, sand and coastal flatsShallow or piled foundations by site
St George’s harbourFill and steep crater wallsFoundations for fill or rock by your engineer
Carriacou and Petite MartiniqueVolcanic and limestone hills, sandy coastsStorm surge levels and light frames

Seismic frames

How we detail for earthquakes

Moment frames

Portal and multi-bay frames for warehouses, halls and resorts.

Braced frames

Efficient bracing for campus buildings, hotels and clinics.

AWS D1.8 welding

Qualified procedures and welders for demand-critical welds.

Base plates and anchors

Base plates sized for uplift and seismic shear together.

Who does what

Ground and seismic work, split clearly

World Steel supplies

  • Frames detailed to AISC 341 where the design calls for it
  • Column reactions for the foundation design
  • Base plates, anchor bolt plans and templates
  • Plate with EN 10204 3.1 certificates on request
  • Remote or in-person inspector access

In Grenada, the contractor and the engineer of record arrange

  • Geotechnical investigation
  • Site class and seismic design category
  • Foundation design and construction
  • Special inspections on site
  • Erection to the drawings

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Grenada has 7 parishes. Open Carriacou and Petite Martinique, St George or St David to see the local wind, ground and coast, the road from St George’s and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Grenada project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Row of columns ending in drilled square base plates
Base plates with their bolt holes on a run of columns, World Steel, Vietnam.

Q&A

What Grenadian buyers ask

Does Kick ’em Jenny affect building design?

It is monitored by the UWI Seismic Research Centre. Design follows the code seismic values for the site, which your engineer sets from the code and the soil report.

Why steel for hillside sites in Grenada?

A steel frame is light, so it loads the slope less, and it adapts to stepped foundations with simple details.

Are the sister islands different?

Carriacou and Petite Martinique are smaller and drier, with lower hills; storm surge and wind govern more than slopes do.

Official sources: UWI Seismic Research Centre

Contact World Steel · Grenada

Talk to us about steel for Grenada

WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.