Project types
What we fabricate for Grenada
Hotel and resort blocks
Multi-storey frames with composite floors for rooms and suites.
Campus buildings
Lecture halls, labs and student housing frames.
Housing
Repeatable steel frames for homes and apartment blocks.
Schools and shelters
Classrooms and halls designed to the shelter risk category.
Clinics and hospitals
Composite frames for health buildings.
Spice and cocoa stations
Drying, processing and storage sheds.
Speed
Open before the season, ready before the term
We fabricate while your site builds the foundations, then ship in erection order so frames rise floor by floor. Composite deck replaces most formwork, and the building closes in fast.
Large packages are released by block or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Grenada Building Code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by block and shipping to St George’s
- Shop and erection drawings, included
The contractor arranges
- Owner contract and approvals
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Grenada has 7 parishes. Open St David, St Andrew or St Patrick to see the local wind, ground and coast, the road from St George’s and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Grenada project is cut, welded, inspected and packed.
Q&A
What Grenadian buyers ask
Can a steel frame save time on a campus building?
Yes. Members are made while foundations are built and composite deck cuts formwork, so the frame and floors go up much faster than cast concrete.
Can you supply repeatable housing frames?
Yes. Repeat house and apartment types are efficient to detail and fabricate in steel, and ship as kits.
Do you work with local contractors?
Yes. Contractors in Grenada are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Grenada solutions
Every Grenada guide
Related pages
Code facts on this page summarize practice in Grenada and the standards it references. They are not legal or engineering advice; your engineer of record and the Planning and Development Authority confirm the code and edition in force for your project.
Contact World Steel · Grenada
Talk to us about steel for Grenada
WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.