Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Grenada · Hurricanes

Hurricane-resistant steel buildings for Grenada

Hurricane Janet struck in 1955, and then for half a century Grenada felt safe. Ivan in 2004 damaged most of the island’s buildings and its nutmeg trees, Emily followed in 2005, and Beryl in 2024 flattened much of Carriacou and Petite Martinique. Most damage starts at the roof edge or a failed opening. We design the whole load path, from cladding to anchor bolts, for the wind your engineer sets.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St George’s.

Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Storms
Janet 1955, Ivan 2004, Beryl 2024
Critical zones
Roof edges and corners
Topography
Hills and ridges
Our part
Load path checked end to end

Where wind wins

Four places we check first

Roof uplift

On roofs in Grenada, edge and corner zones carry much more suction than the middle.

Large openings

A failed door or window pressurizes the building; we design for it.

Connections

Purlin cleats, flange braces and anchors carry reversing storm loads.

Hills and ridges

Grenada’s ridges and the hills around St George’s speed wind up.

By site

How the site changes the wind on your steel

Your engineer of record in Grenada confirms the values.

SiteWhat changes
Carriacou and Petite MartiniqueSmall, low islands with little shelter
St George’s hillsidesTopographic speed-up on steep slopes
Grand Anse and the south coastOpen sea exposure to the south and west
East coast, St Andrew and St DavidAtlantic exposure and salt spray
Grand Etang and the interiorMountain ridges and gusts

Shelters

Buildings that shelter people

Schools and halls

Many serve as hurricane shelters and need a higher risk category.

Protected openings

Doors, shutters and glazing designed with the frame.

Back-up power

Steel supports for generators and water tanks sized for storm loads.

Grenada

What we do not claim

We do not publish wind ratings or certify buildings in Grenada for a hurricane category. The design is checked by your engineer of record for the loads set for your site in Grenada.

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Grenada has 7 parishes. Open St Patrick, St Mark or St John to see the local wind, ground and coast, the road from St George’s and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Grenada project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Q&A

What Grenadian buyers ask

Is Grenada really in the hurricane belt?

Yes. Strikes are less frequent than further north, but Ivan, Emily and Beryl showed they happen. Every building is designed for the code wind speed.

What did Ivan and Beryl teach builders?

That roofs, openings and connections fail first. Rebuilding focuses on a continuous load path from roof to foundation, which is how we design steel frames.

Do you supply the roof and wall cladding too?

Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in Grenada.

Official sources: Grenada Meteorological Service · National Disaster Management Agency

Contact World Steel · Grenada

Talk to us about steel for Grenada

WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.