Why it matters
Lessons from Ivan on every sheet
Ivan showed that buildings fail at their weakest link: a roof sheet, a purlin cleat, a door. Reviewers in Grenada look for a continuous load path from roof to foundation, and a clear design basis lets them follow it.
University, hotel and international owners often add their own specifications, usually based on US practice. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.
Design basis
What the steel design states
The items we confirm with your engineer of record in Grenada before modeling.
| Item | What we state |
|---|---|
| Code | The Grenada Building Code and the editions it references |
| Wind | Basic wind speed, exposure, topography and risk category |
| Seismic | Site class, spectral values and seismic design category |
| Steel | AISC 360 design, AISC 341 where seismic detailing applies |
| Owner specs | Campus, hotel or owner specifications where required |
Who does what
Approval work, split clearly
World Steel supplies
- Steel design or detailing to the Grenada Building Code
- Calculations and drawings for review
- Answers to plan-review comments on the steel in Grenada
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Grenada, the contractor and the engineer of record arrange
- Planning and Development Authority approval
- Geotechnical report and site class
- Inspections on site
- Foundations
- Erection
Grenada
What we do not claim
World Steel holds no approval, licence or registration in Grenada and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Grenada.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Grenada has 7 parishes. Open St George, St David or St Andrew to see the local wind, ground and coast, the road from St George’s and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Grenada project is cut, welded, inspected and packed.
Q&A
What Grenadian buyers ask
Who approves a steel building in Grenada?
The Planning and Development Authority. Your team files the application with the engineer or architect of record.
Do Carriacou and Petite Martinique follow the same code?
Yes. The same national rules apply on the sister islands; your team confirms the local filing route.
Does the Grenada code use US standards?
It comes from the regional OECS model code, and engineers commonly use the IBC, ASCE 7 and AISC 360 for the detail. Your engineer of record sets the exact basis.
Official sources: National Disaster Management Agency
Grenada solutions
Every Grenada guide
Related pages
Code facts on this page summarize practice in Grenada and the standards it references. They are not legal or engineering advice; your engineer of record and the Planning and Development Authority confirm the code and edition in force for your project.
Contact World Steel · Grenada
Talk to us about steel for Grenada
WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.