Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

The Bahamas · Storm surge

Steel buildings designed for storm surge and flooding in The Bahamas

Most of The Bahamas is flat limestone a few metres above the sea; the highest point in the country, on Cat Island, is only 63 m. During Dorian, storm surge swept across parts of Abaco and Grand Bahama several metres deep. Steel suits surge country: frames can lift floors above the design flood level, lower levels can stay open so water passes through, and galvanized bases shrug off salt water.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Nassau or Freeport.

Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Ground
Low limestone
Highest point
63 m, Cat Island
Approach
Raise, open, anchor
Bases
Galvanized on request

How steel helps

Four ways to build above the water

Raised floors

Steel frames lift floors above the design flood level your engineer sets.

Open lower levels

Parking or storage under the building lets surge water pass through.

Slender columns

Fewer, slimmer columns catch less water and debris than walls.

Galvanized bases

Base plates and lower columns galvanized against salt water.

Ground

What the islands stand on

Your geotechnical engineer confirms the ground for each site.

GroundWhereWhat it means for steel
Hard limestoneRidges on most islandsGood bearing; anchors drilled into rock
Sand and beach ridgesCoasts and resort sitesScour and settlement checked
Marsh and mangrove fringeLow west sides of Andros, Abaco, Grand BahamaRaised floors, deeper foundations
FillHarbours and new resortsSettlement and surge levels checked

Who does what

Flood design, split clearly

World Steel supplies

  • Frames sized for raised floors and open lower levels
  • Column reactions including flood loads
  • Galvanized base plates and lower members on request
  • Anchor bolt plans and templates
  • Erection drawings

In The Bahamas, the contractor and the engineer of record arrange

  • Design flood and surge level
  • Survey and soil report
  • Foundation design for scour and uplift
  • Breakaway walls and flood openings
  • Erection and site works

The Bahamas

What we do not claim

Flood and surge levels are set by your engineer of record and the authorities, not by World Steel. We design the steel to the levels and loads they set.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The Bahamas has 14 islands. Open Eleuthera, Exuma or Cat Island to see the local wind, ground and coast, the road from Nassau and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Bahamas project is cut, welded, inspected and packed.

Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Welder guiding a drilled base plate hanging from a jib hoist
A drilled base plate on its way to fit-up in the Vietnam plant.
Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Row of columns ending in drilled square base plates
Base plates with their bolt holes on a run of columns, World Steel, Vietnam.

Q&A

What Bahamian buyers ask

How high should the floor be?

Your engineer of record and the authorities set the design flood level for the site. We design the steel to lift the floor above it.

Can the ground floor stay open?

Yes. Open lower levels with parking or storage let surge water pass under the building, a common choice on low coasts.

Should columns be galvanized?

Base plates and lower columns that may meet salt water often are. Your engineer and the owner decide.

Official sources: National Emergency Management Agency

Contact World Steel · The Bahamas

Talk to us about steel for the Bahamas

WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.