The Bahamas · Building code

Structural steel and the Bahamas Building Code

Outside Freeport, building approvals in The Bahamas go through the Ministry of Works and its Building Control Division, under the Bahamas Building Code. Inside the Freeport area of Grand Bahama, the Grand Bahama Port Authority runs its own building department. After Dorian, reviewers look hard at wind design and floor levels. Your engineer of record sets the basis; we state it on the first sheet of our calculations.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Nassau or Freeport.

Columns and floor beams of a multi-story steel frame partway through erection
Going up beside the plant in Vietnam: World Steel framed its own office building.
Code
Bahamas Building Code
Approvals
Ministry of Works, Building Control
Freeport
Grand Bahama Port Authority
Our part
Code stated on sheet one

Why it matters

Wind first, then everything else

In The Bahamas the wind load sets the size of almost every member and connection. Reviewers want to see the basic wind speed, exposure and risk category stated clearly, and the load path traced from roof cladding to foundation.

Resort operators and international owners often add their own standards, usually based on US practice. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.

Design basis

What the steel design states

The items we confirm with your engineer of record in the Bahamas before modeling.

ItemWhat we state
CodeThe Bahamas Building Code and the US standards it references
WindBasic wind speed, exposure and risk category
FloodDesign flood and surge level from your engineer
SteelAISC 360 design, AISC 341 only where required
Owner specsResort or owner specifications where required

Who does what

Approval work, split clearly

World Steel supplies

  • Steel design or detailing to the Bahamas Building Code
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in the Bahamas
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In The Bahamas, the contractor and the engineer of record arrange

  • Building permit from Building Control or the Port Authority
  • Planning and environmental approvals
  • Survey, flood level and soil report
  • Inspections on site
  • Foundations and erection

The Bahamas

What we do not claim

World Steel holds no approval, licence or registration in The Bahamas and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in the Bahamas.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The Bahamas has 14 islands. Open New Providence, Grand Bahama or Abaco to see the local wind, ground and coast, the road from Nassau and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Bahamas project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Bahamian buyers ask

Who approves a steel building in Nassau?

The Ministry of Works through its Building Control Division, under the Bahamas Building Code. Your team files the application with the engineer or architect of record.

Is Freeport different?

Yes. Inside the Freeport area, the Grand Bahama Port Authority handles building approvals under its own procedures.

Does the Bahamas code use US standards?

It references US practice, and engineers commonly design with the IBC, ASCE 7 and AISC 360. Your engineer of record sets the exact basis.

Official sources: Grand Bahama Port Authority

Contact World Steel · The Bahamas

Talk to us about steel for the Bahamas

WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.