Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

The Bahamas · Coatings

Coatings for steel in The Bahamas’ salt air

On narrow, low islands, salt reaches every building. Beachfront resorts, marinas and dock warehouses sit in spray; even inland sites see salt carried on the trade winds and storm-blown sea water after a hurricane. For the Bahamas we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Nassau or Freeport.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Exposure
Salt on every island
Worst
Beachfront and marinas
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for the Bahamas, confirmed with your engineer for each project.

SiteTypical protection
Enclosed building, inlandZinc-rich primer, epoxy, polyurethane finish
Town near the coastHigh-build marine paint system
Beachfront resortsDuplex: galvanizing plus paint
Marinas and docksHot-dip galvanizing or duplex
Lower columns in flood zonesGalvanized, with sealed base details

In our plant

How coating quality is built in

Blast cleaning

Members for the Bahamas are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for the Bahamas.

Measured film

Dry film thickness measured and recorded for every member shipped to the Bahamas.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are available for touch-up.

The Bahamas

After erection

Every bundle shipped to Nassau carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The Bahamas has 14 islands. Open Long Island, San Salvador or Acklins and Crooked Island to see the local wind, ground and coast, the road from Nassau and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Bahamas project is cut, welded, inspected and packed.

Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Bahamian buyers ask

Is galvanizing worth it in The Bahamas?

For exposed steel, marinas, docks and beachfront buildings, usually yes, often with a paint finish on top. Enclosed frames can use a high-build paint system.

What about steel soaked by storm surge?

Rinse it with fresh water as soon as possible and inspect the coating. Galvanized steel tolerates it best.

Can we buy matching touch-up paint?

Yes. Each shipment names the products, from brands sold in the region.

Contact World Steel · The Bahamas

Talk to us about steel for the Bahamas

WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.