Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

The Bahamas · Hurricanes

Hurricane-resistant steel buildings for The Bahamas

Every island in The Bahamas lies in the Atlantic hurricane belt. Andrew in 1992, Matthew in 2016 and Dorian in 2019, which stalled over Abaco and Grand Bahama for more than a day, each left a lesson. Buildings fail where the roof edge lifts, a door blows in or a connection pulls apart. We design the whole load path, from cladding to anchor bolts, for the wind your engineer sets.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Nassau or Freeport.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Storms
Andrew, Matthew, Dorian
Critical zones
Roof edges and corners
Exposure
Open water all round
Our part
Load path checked end to end

Where wind wins

Four places we check first

Roof uplift

On roofs in the Bahamas, edge and corner zones carry much more suction than the middle.

Large openings

A failed door or window pressurizes the building; we design for it.

Connections

Purlin cleats, flange braces and anchors carry reversing storm loads.

Open water

Flat islands with open sea on every side mean the highest exposure.

Shelters

Buildings that must stay standing

Schools and clinics

Many serve as hurricane shelters and need a higher risk category.

Protected openings

Shutters, doors and glazing designed with the frame.

Power and water

Supports for generators, tanks and desalination plants sized for storm loads.

Who does what

Storm design, split clearly

World Steel supplies

  • Frames, purlins and girts designed for the stated wind
  • Roof and wall panels with fixing patterns
  • Connection and anchor design for uplift
  • Opening frames for rated doors and shutters
  • Erection drawings with bracing sequence

In The Bahamas, the contractor and the engineer of record arrange

  • Wind speed, exposure and risk category
  • Foundation design for uplift
  • Rated doors, windows and shutters
  • Inspections on site
  • Erection and temporary bracing

The Bahamas

What we do not claim

We do not publish wind ratings or certify buildings in the Bahamas for a hurricane category. The design is checked by your engineer of record for the loads set for your site in the Bahamas.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The Bahamas has 14 islands. Open Bimini, Berry Islands or Andros to see the local wind, ground and coast, the road from Nassau and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Bahamas project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Q&A

What Bahamian buyers ask

Can a steel building survive a storm like Dorian?

A steel building designed and built for the code wind speed, with a continuous load path and protected openings, performs well. We design to the values your engineer sets; we do not rate buildings for a storm category.

Do you supply roof and wall cladding?

Yes. Panels, purlins, girts and fixings can ship with the frame, designed for the same wind.

Can a school be designed as a shelter?

Yes. Your engineer sets the higher risk category and we design the frame, openings and connections to it.

Official sources: Bahamas Department of Meteorology · National Emergency Management Agency

Contact World Steel · The Bahamas

Talk to us about steel for the Bahamas

WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.