Exposure
Matching the system to the site
Typical choices for St Kitts and Nevis, confirmed with your engineer for each project.
| Site | Typical protection |
|---|---|
| Inland, enclosed building | Zinc-rich primer and finish coat on sheltered steel |
| Basseterre and Charlestown | Zinc-rich primer, epoxy intermediate, polyurethane finish |
| Beachfront resorts | Marine-grade high-build system or duplex |
| South East Peninsula and Atlantic coasts | Hot-dip galvanizing or duplex systems |
| Marinas and boatyards | Duplex systems for splash and spray |
In our plant
How coating quality is built in
Blast cleaning
Members for St Kitts and Nevis are blast cleaned to the specified grade before priming.
Trained painters
Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for St Kitts and Nevis.
Measured film
Dry film thickness measured and recorded for every member shipped to St Kitts and Nevis.
Brands sold locally
Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in St Kitts and Nevis can buy them for touch-up.
St Kitts and Nevis
After erection
Every bundle shipped to Basseterre carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
St Kitts and Nevis has 14 parishes. Open St Paul Charlestown, St John Figtree or St George Gingerland to see the local wind, ground and coast, the road from Basseterre and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your St Kitts and Nevis project is cut, welded, inspected and packed.
Q&A
What Kittitian and Nevisian buyers ask
Should resort steel be galvanized?
Exposed steel close to the beach often is, or gets a duplex system. Enclosed steel inside the building can take a lighter system.
Is Nevis different from St Kitts?
Not much: both are small, and salt reaches most sites. The system follows each site’s exposure.
Can we buy matching touch-up paint?
Yes. The brands we use are sold across the Caribbean, and each shipment to Basseterre names the products.
St Kitts and Nevis solutions
Every St Kitts and Nevis guide
Related pages
Code facts on this page summarize practice in St Kitts and Nevis and the standards it references. They are not legal or engineering advice; your engineer of record and the planning authority on each island confirm the code and edition in force for your project.
Contact World Steel · St Kitts and Nevis
Talk to us about steel for St Kitts and Nevis
WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.