Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Kitts and Nevis · Building code

Structural steel and the St Kitts and Nevis building code

The federation has two approval routes. On St Kitts, the Development Control and Planning Board approves new buildings; on Nevis, the Nevis Island Administration runs its own physical planning office. The national building code comes from the regional OECS model code. Your engineer of record sets the basis; we state it on the first sheet of our calculations and keep it on every drawing.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Basseterre.

Columns and floor beams of a multi-story steel frame partway through erection
Going up beside the plant in Vietnam: World Steel framed its own office building.
St Kitts
Development Control and Planning Board
Nevis
Nevis physical planning
Design basis
Set by your engineer of record
Our part
Code stated on sheet one

Why it matters

Two islands, one clear basis

Resort, campus and international owners in the federation often bring their own specifications, usually based on US practice, on top of the national code. Reviewers on both islands look for a clear wind and seismic basis and a continuous load path.

We design to the basis your engineer of record agrees with the owner and the authorities on the island where the building stands, and keep it on every sheet.

Design basis

What the steel design states

The items we confirm with your engineer of record in St Kitts and Nevis before modeling.

ItemWhat we state
CodeThe national building code and the editions it references
WindBasic wind speed, exposure, topography and risk category
SeismicSite class, spectral values and seismic design category
SteelAISC 360 design, AISC 341 where seismic detailing applies
Owner specsResort, campus or owner specifications where required

Who does what

Approval work, split clearly

World Steel supplies

  • Steel design or detailing to the St Kitts and Nevis building code
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in St Kitts and Nevis
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In St Kitts and Nevis, the contractor and the engineer of record arrange

  • Planning approval on St Kitts or Nevis
  • Geotechnical report and site class
  • Inspections on site
  • Foundations
  • Erection

St Kitts and Nevis

What we do not claim

World Steel holds no approval, licence or registration in St Kitts and Nevis and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in St Kitts and Nevis.

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your St Kitts and Nevis project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Kittitian and Nevisian buyers ask

Who approves a steel building on St Kitts?

The Development Control and Planning Board. Your team files the application with the engineer or architect of record.

Is the route different on Nevis?

Yes. The Nevis Island Administration handles planning on Nevis through its own physical planning office. Your team confirms the filing.

Does the code use US standards?

It comes from the regional OECS model code, and engineers commonly use the IBC, ASCE 7 and AISC 360 for the detail. Your engineer of record sets the exact basis.

Contact World Steel · St Kitts and Nevis

Talk to us about steel for St Kitts and Nevis

WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.