Project types
What we fabricate for St Kitts and Nevis
Hotel and resort blocks
Multi-storey frames with composite floors for rooms and suites.
Campus buildings
Lecture halls, labs and student housing frames.
Factories
Portal frames for assembly plants and workshops.
Warehouses
Clear-span storage near the port and airport.
Clinics and hospitals
Composite frames for health buildings.
Schools and shelters
Classrooms and halls designed to the shelter risk category.
Speed
Open before the season, ready before the term
We fabricate while your site builds the foundations, then ship in erection order so frames rise floor by floor. Composite deck replaces most formwork, and the building closes in fast.
Large packages are released by block or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the St Kitts and Nevis building code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by block and shipping to either island
- Shop and erection drawings, included
The contractor arranges
- Owner contract and approvals
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
St Kitts and Nevis has 14 parishes. Open St Peter Basseterre, Trinity Palmetto Point or St Thomas Middle Island to see the local wind, ground and coast, the road from Basseterre and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your St Kitts and Nevis project is cut, welded, inspected and packed.
Q&A
What Kittitian and Nevisian buyers ask
Can a steel frame save time on a resort?
Yes. Members are made while foundations are built and composite deck cuts formwork, so the frame and floors go up much faster than cast concrete.
Can you supply factory and warehouse buildings?
Yes. Portal frames, crane bays and clear-span warehouses, designed for the wind your engineer sets.
Do you work with local contractors?
Yes. Contractors in St Kitts and Nevis are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
St Kitts and Nevis solutions
Every St Kitts and Nevis guide
Related pages
Code facts on this page summarize practice in St Kitts and Nevis and the standards it references. They are not legal or engineering advice; your engineer of record and the planning authority on each island confirm the code and edition in force for your project.
Contact World Steel · St Kitts and Nevis
Talk to us about steel for St Kitts and Nevis
WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.