Why it matters
Wind, earthquake and slope in one basis
Saint Lucia’s reviewers look at three things on most sites: the hurricane wind, the earthquake load and the stability of the slope the building sits on. A clear statement of the code, the wind and seismic values and the foundation reactions on the first sheet lets every reviewer check the same numbers.
Resort groups often add their own specifications, usually based on US practice. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.
Design basis
What the steel design states
The items we confirm with your engineer of record in Saint Lucia before modeling.
| Item | What we state |
|---|---|
| Code | The Saint Lucia Building Code and the editions it references |
| Wind | Basic wind speed, exposure, topography and risk category |
| Seismic | Site class, spectral values and seismic design category |
| Steel | AISC 360 design, AISC 341 where seismic detailing applies |
| Owner specs | Resort brand or owner specifications where required |
Who does what
Approval work, split clearly
World Steel supplies
- Steel design or detailing to the Saint Lucia Building Code
- Calculations and drawings for review
- Answers to plan-review comments on the steel in Saint Lucia
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Saint Lucia, the contractor and the engineer of record arrange
- Development Control Authority approval
- Slope and geotechnical studies
- Site class and foundations
- Inspections on site
- Erection
Saint Lucia
What we do not claim
World Steel holds no approval, licence or registration in Saint Lucia and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Saint Lucia.
Products and solutions
The World Steel pages behind this guide
Quarter by quarter
How this applies in your quarter
Saint Lucia has 9 quarters. Open Castries, Gros Islet or Anse la Raye and Canaries to see the local wind, ground and coast, the road from Castries and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Saint Lucia project is cut, welded, inspected and packed.
Q&A
What Saint Lucian buyers ask
Who approves a steel building in Saint Lucia?
The Development Control Authority. Your team files the application with the engineer or architect of record.
Is the Saint Lucia code based on US standards?
It comes from the regional OECS model code, which draws on international practice. Engineers commonly use the IBC, ASCE 7 and AISC 360 for the detail. Your engineer of record sets the exact basis.
Can you work to a resort brand’s standards?
Yes. We design to the basis your engineer of record agrees with the owner, including brand standards, and state it on every sheet.
Official sources: National Emergency Management Organisation
Saint Lucia solutions
Every Saint Lucia guide
Related pages
Code facts on this page summarize practice in Saint Lucia and the standards it references. They are not legal or engineering advice; your engineer of record and the Development Control Authority confirm the code and edition in force for your project.
Contact World Steel · Saint Lucia
Talk to us about steel for Saint Lucia
WhatsApp, email or a video call with our engineers, booked at an hour that suits Castries. Our contact page for Saint Lucia has the ports, the local time and the form.