Project types
What we fabricate for resorts and public works
Hillside hotel blocks
Multi-storey frames stepping down the slope, with composite floors.
Lobbies and restaurants
Long-span roofs and open lobbies facing the view.
Villas and apartments
Repeatable steel frames for villas and apartment blocks.
Schools and shelters
Classrooms and halls designed to the shelter risk category.
Clinics and hospitals
Composite frames for health buildings.
Walkways and footbridges
Covered walkways and footbridges across ravines.
Speed
Light on the slope, quick to close in
We fabricate while your site cuts the platforms and builds the foundations, then ship in erection order so frames rise level by level down the hill. Composite deck replaces most formwork, and small cranes can place the members.
Large packages are released by block or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Saint Lucia Building Code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by block and shipping to your port
- Shop and erection drawings, included
The contractor arranges
- Owner contract and approvals
- Engineer of record approval
- Platforms, retaining walls and foundations
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Quarter by quarter
How this applies in your quarter
Saint Lucia has 9 quarters. Open Vieux Fort, Micoud or Dennery to see the local wind, ground and coast, the road from Castries and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Saint Lucia project is cut, welded, inspected and packed.
Q&A
What Saint Lucian buyers ask
Can a steel frame work on a steep resort site?
Yes. Columns of different heights and stepped foundations let the frame follow the slope, and the light weight keeps loads on the hillside low.
Do you supply composite deck and studs?
Yes. Decking, shear studs and secondary steel can ship with the frame.
Do you work with local contractors?
Yes. Contractors in Saint Lucia are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Saint Lucia solutions
Every Saint Lucia guide
Related pages
Code facts on this page summarize practice in Saint Lucia and the standards it references. They are not legal or engineering advice; your engineer of record and the Development Control Authority confirm the code and edition in force for your project.
Contact World Steel · Saint Lucia
Talk to us about steel for Saint Lucia
WhatsApp, email or a video call with our engineers, booked at an hour that suits Castries. Our contact page for Saint Lucia has the ports, the local time and the form.