What we fabricate
Steel for a working plant
Process buildings
Frames sized for equipment, services and future expansion.
Mezzanines and platforms
Stiff floors for process equipment, with stairs and handrail.
Pipe racks
Multi-level racks for utilities and process lines, galvanized or coated.
Cold stores
Roof steel for insulated panels and refrigeration equipment.
Crane bays
Runway girders and brackets, with overhead cranes on request.
Utility buildings
Boiler, chiller and generator buildings with equipment supports.
Tolerances and records
Built to the drawing, recorded by member
Process equipment needs steel where the drawing says. Our laser machines cut plate up to 100 mm thick and drill holes in the same pass, and every member is checked and recorded before it is painted.
Each shipment carries mill certificates traced by heat, coating records and packing lists, so your quality team can close out the steel package without chasing paper.
Who does what
Plant work, split clearly
World Steel supplies
- Steel design or detailing to the Puerto Rico Building Code
- Fabrication, coating and QC release by area
- Mezzanines, stairs, handrail and pipe racks
- Packing by area and shipping to San Juan
- Shop and erection drawings, included
The contractor arranges
- Owner contract and permits
- Engineer of record approval
- Foundations and anchor bolts
- Erection and alignment
- Process, services and validation
Products and solutions
The World Steel pages behind this guide
Municipality by municipality
How this applies in your municipality
Puerto Rico has 78 municipalities. Open Vega Alta, Vega Baja or Manatí to see the local wind, ground and coast, the road from San Juan and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Puerto Rico project is cut, welded, inspected and packed.
Q&A
What Puerto Rican buyers ask
Can you supply steel for a pharmaceutical plant expansion?
Yes. Process buildings, mezzanines, pipe racks and utility buildings, fabricated to your engineer’s design and released area by area.
Do you supply overhead cranes?
Yes, on request, with the building. Runway girders and brackets are fabricated with the frame.
What records come with the steel?
Mill certificates traced by heat, dimensional and coating records, and packing lists for every bundle.
Puerto Rico solutions
Every Puerto Rico guide
Related pages
Code facts on this page summarize practice in Puerto Rico and the standards it references. They are not legal or engineering advice; your engineer of record and OGPe or the municipality confirm the code and edition in force for your project.
Contact World Steel · Puerto Rico
Talk to us about steel for Puerto Rico
WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.