Why it matters
One national code, fourteen permit offices
Before 2018 Jamaica relied on an older code and on practice. The Building Act made the National Building Code law, so every new plant, warehouse and hotel is reviewed against the same rules for structure, wind and earthquakes.
Each parish has its municipal corporation, and large or sensitive projects may also need planning and environmental permission. We confirm the code edition and the review path with your engineer of record, state the loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your engineer of record in Jamaica before modeling.
| Item | What we state |
|---|---|
| Code | Jamaica National Building Code edition and the referenced standards |
| Wind | Basic wind speed, exposure category and risk category |
| Seismic | Site class, spectral values and seismic design category |
| Steel | AISC 360 design, AISC 341 where seismic detailing applies |
| Welding | AWS D1.1 procedures, AWS D1.8 where the frame needs it |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the Jamaica National Building Code
- Calculations and drawings for plan review
- Answers to plan-review comments on the steel in Jamaica
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Jamaica, the contractor and the engineer of record arrange
- The building permit application
- Review and approval by the engineer of record
- Geotechnical report and site class
- Inspections on site
- Foundations and erection
Jamaica
What we do not claim
World Steel holds no Jamaican approval, licence or registration and does not apply for permits. The engineer or architect of record approves the design and your team files it with the municipal corporation.
Products and solutions
The World Steel pages behind this guide
Jamaica parish by parish
How this applies in your parish
Jamaica has 14 parishes. Open Kingston, St. Andrew or St. Thomas to see the local wind, ground and coast, the road from Kingston and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Jamaican project is cut, welded, inspected and packed.
Q&A
What Jamaican buyers ask
Who issues the building permit for steel buildings in Jamaica?
The municipal corporation of the parish where the site is. Large projects may also need planning and environmental permission. Your team files the application.
Is the Jamaica code the same as the US IBC?
It is based on the International Building Code with Jamaican requirements added. US standards such as ASCE 7 and AISC 360 are commonly referenced, which suits steel designed to US practice.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise the drawings through your engineer of record.
Official sources: Bureau of Standards Jamaica · Kingston and St. Andrew Municipal Corporation
Jamaica solutions
Every Jamaica guide
Related pages
Code facts on this page summarize Jamaican practice and the standards it references. They are not legal or engineering advice; your engineer of record and the municipal corporation confirm the code and edition in force for your project.
Contact World Steel · Jamaica
Talk to us about steel for Jamaica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.