Top and bottom chords
Built-up or rolled members, spliced with bolted plates where the span is longer than one shipping length.
Steel trusses →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Anatomy of a truss footbridge
Built-up or rolled members, spliced with bolted plates where the span is longer than one shipping length.
Steel trusses →Drilled from templates and fitted in our plant, so the field bolts go in without reaming.
Structural bolts →Cross beams carry a concrete, grating or plate deck, with the drainage slope set in the steel.
Metal decking →Handrails and guards, and over roads or rail the screening the owner asks for.
Guardrails →Stair towers and ramp frames at each end, designed with the span.
Stairs →
From our project files
The grey truss bridge at the top of this page went up in Singapore in 2020. The red Foot Bridge below followed in 2025: portal frames along a deck over a canal, joined with splices fitted in our shop.
Photo
Photo
Photo
Photo
Before the shop drawings
Light, long spans can bounce under walking crowds. The design team checks the natural frequency and stiffens the truss where it needs it.
Camber is built into the shop drawings and checked at fit-up, so the deck sits level once it carries its own weight.
De-icing salt and traffic spray reach the steel, so the coating system is set for that exposure, often galvanizing with a paint topcoat.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes. We fabricated a steel truss bridge in Singapore in 2020 and the red steel Foot Bridge in Singapore in 2025. Both are shown on this page.
A span is cut into segments that fit a container or a flat rack, with bolted splices fitted in our plant. The design team sets the splice points with us.
The code the owner and the Engineer of Record name, usually the AASHTO guide specification for pedestrian bridges, with loads to ASCE 7 for any building parts.
Our plant holds IAS AC472 accreditation. Some owners ask for a specific bridge fabricator certification; check the specification before bidding and tell us what it asks for.
Federally funded transit and highway work often requires steel produced in the United States, which steel made in Vietnam does not meet. Our bridges suit privately and locally funded work without that rule.
Yes. The plant fabricates 2,500 t of structural steel a month, so a footbridge can be fabricated and shipped with the station or campus buildings it connects.
Keep reading
Price it or partner with us
Share the span, the clearances, the deck and the code the owner names. We will price the bridge and the stair towers together.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833