Pedestrian bridges

Pedestrian bridges: fitted in the shop, lifted in a night

A footbridge over a road, a rail line or a station forecourt is usually lifted in a short closure, so every splice has to fit the first time. We fit the trusses up in our plant before they ship, and we have built steel footbridges in Singapore in 2020 and 2025. Our plant fabricates 2,500 t of structural steel a month, so a bridge can run beside the buildings of the same program.

Truss of the Singapore steel bridge laid out for fit-up in the World Steel plant
The trusses are laid out and bolted together in the shop, so splices and camber are checked before anything ships.
Steel bridge truss checked and coated in the World Steel plant before shipping
Each segment is coated and marked before it leaves the plant, so the crew sets it in the order the erection drawing shows.
Steel bridge truss being lifted into place at night in Singapore
On site the assembled span goes up in one lift, here at night, so the road below closes for hours rather than days.
Walkway between the trusses of the Singapore steel bridge during fit-out
Floor beams, the deck support and the handrail posts arrive drilled, so the walkway goes in without site cutting.

Large-project capacity

A bridge and the buildings it joins, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Anatomy of a truss footbridge

What we fabricate for a span

TOP CHORD DECK ON FLOOR BEAMS SPLICE SPLICE STAIR STAIR

Top and bottom chords

Built-up or rolled members, spliced with bolted plates where the span is longer than one shipping length.

Steel trusses →

Bolted splices

Drilled from templates and fitted in our plant, so the field bolts go in without reaming.

Structural bolts →

Floor beams and deck

Cross beams carry a concrete, grating or plate deck, with the drainage slope set in the steel.

Metal decking →

Rails and fencing

Handrails and guards, and over roads or rail the screening the owner asks for.

Guardrails →

Stair and ramp towers

Stair towers and ramp frames at each end, designed with the span.

Stairs →
Grey steel truss pedestrian bridge by World Steel resting on its supports in Singapore

From our project files

Two footbridges in Singapore

The grey truss bridge at the top of this page went up in Singapore in 2020. The red Foot Bridge below followed in 2025: portal frames along a deck over a canal, joined with splices fitted in our shop.

Red steel portal frames of the Foot Bridge in Singapore lined up along the walkway Photo
View along the deck of the red steel Foot Bridge in Singapore between trees Photo
Bolted splice plate on a red steel member of the Foot Bridge in Singapore Photo
Red steel deck frame of the Foot Bridge in Singapore over a canal Photo

Before the shop drawings

Three checks a footbridge needs

Footfall vibration

Light, long spans can bounce under walking crowds. The design team checks the natural frequency and stiffens the truss where it needs it.

Camber and fit

Camber is built into the shop drawings and checked at fit-up, so the deck sits level once it carries its own weight.

Exposure over roads

De-icing salt and traffic spray reach the steel, so the coating system is set for that exposure, often galvanizing with a paint topcoat.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Truss, floor, rail and stair tower steel designed to the contract documents and the code the owner names
  • Shop fit-up of the spans before shipping, with splices drilled and match-marked
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Galvanizing by an outside galvanizer in Vietnam, or paint, and fabrication in our IAS AC472-accredited plant, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record and the owner
  • Abutments, piers, bearings seats and foundations
  • Road or rail closures, the lift plan and the crane
  • Erection, deck finish, lighting and fit-out

Questions from US contractors

Pedestrian bridge steel: questions and answers

6 answers, grouped by topic.

Footbridge steel 3 answers

Have you built pedestrian bridges before?

Yes. We fabricated a steel truss bridge in Singapore in 2020 and the red steel Foot Bridge in Singapore in 2025. Both are shown on this page.

How long a span can be shipped?

A span is cut into segments that fit a container or a flat rack, with bolted splices fitted in our plant. The design team sets the splice points with us.

Which design code do you work to?

The code the owner and the Engineer of Record name, usually the AASHTO guide specification for pedestrian bridges, with loads to ASCE 7 for any building parts.

Owners and funding 3 answers

Is World Steel a certified bridge fabricator?

Our plant holds IAS AC472 accreditation. Some owners ask for a specific bridge fabricator certification; check the specification before bidding and tell us what it asks for.

Can your steel be used on federally funded work?

Federally funded transit and highway work often requires steel produced in the United States, which steel made in Vietnam does not meet. Our bridges suit privately and locally funded work without that rule.

Can a bridge ship with the buildings of the same job?

Yes. The plant fabricates 2,500 t of structural steel a month, so a footbridge can be fabricated and shipped with the station or campus buildings it connects.

Keep reading

Related pages

Price it or partner with us

Send the bridge layout and the span.

Share the span, the clearances, the deck and the code the owner names. We will price the bridge and the stair towers together.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →