Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trail and park bridges

Trail and park bridges: steel that walks in to the crossing

A trail bridge often stands where no truck can reach the bank: across a creek, a ravine or a wetland at the end of a greenway. The span has to arrive in pieces a small crew and a light crane can handle, and bolt together without surprises. Our plant fabricates 2,500 t of structural steel a month, so a parks program of many crossings can be fabricated together and shipped crossing by crossing.

Crossing ahead · steel by World Steel

  • Creek, ravine or wetland
  • No road to the far bank
  • Segments a small crew can lift
  • Bolted splices, no site welding

Large-project capacity

Every crossing of a greenway, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

Pick the crossing

The span sets the form, and the form sets the shipping

Choose a crossing to see the bridge form that usually suits it and how it travels to the bank.

GIRDER SPAN · ONE PIECE PONY TRUSS · THREE SEGMENTS THROUGH TRUSS · FOUR SEGMENTS

Short crossing

Beam or girder span

Two rolled or built-up girders with floor beams between them. A short span often ships whole in a 40 ft container or on a flat rack and goes in with one lift.

Creek or ravine

Pony truss

Low trusses on each side double as the handrail. The span ships in two or three segments with bolted splices fitted in our plant.

River or wetland

Through truss

Taller trusses with bracing overhead carry a longer span. It ships in more segments, each light enough for the crane the site can take.

Red dashed boxes are the bolted splices. The Engineer of Record sets the final form and span.

End of the trail

Getting a steel span to a bank with no road

Segments sized for the site

We size each segment to the lightest crane and the narrowest trail the contractor names, then place the splices to match.

Bolted, not welded on site

Every field joint is bolted with plates drilled in our plant, so no welding is needed at the creek.

Marked for the crossing

Each segment carries its crossing and position, so bundles for several bridges can share a container and still be sorted at the trailhead.

From our project files

CFG Long An bridge, about 196 t

A red steel truss bridge at a riverside site in Long An, Vietnam, fabricated in 2023. Its members were coated in our plant, and the trusses went up by mobile crane from the bank. We do not have a US trail bridge reference yet.

See the project
Red steel truss of the CFG Long An bridge assembled on the bank of the river Photo
Aerial view of the CFG Long An site beside the river in Vietnam Photo
Red-coated box members for the CFG Long An bridge in the World Steel plant Photo
Barge moored at the riverbank beside the CFG Long An site Photo

Weather and water

Three finishes for a park crossing

Galvanized

Hot-dip galvanizing by an outside galvanizer in Vietnam, for crossings that should need little care for many years.

Painted

A paint system in the colour the park wants, applied in our paint shop by painters trained by the paint maker.

Galvanized and painted

A duplex system where splash, de-icing salt or the park setting asks for both.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Girders, trusses, floor beams, bracing and rails designed to the contract documents and the code the owner names
  • Segments sized for the site access, with splices drilled and fitted in our plant
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Galvanizing by an outside galvanizer in Vietnam, or paint, and fabrication in our IAS AC472-accredited plant, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record and the owner
  • Abutments, footings, bearings seats and any permits for the waterway
  • Access to the bank, the crane and the lift
  • Erection, deck boards or decking, approaches and landscaping

Questions from US contractors

Trail and park bridge steel: questions and answers

6 answers, grouped by topic.

Spans and delivery 3 answers

How do you get a bridge to a site with no road?

We cut the span into segments that the trail, the crane and the crew can handle, with bolted splices fitted in our plant. The contractor tells us the access limits and we design the splices around them.

What deck can the steel carry?

Timber boards, composite boards, grating or a concrete slab on metal deck. The floor beams are designed for the deck and the loads the owner sets, including maintenance vehicles where the trail allows them.

Have you built a bridge like this?

We fabricated the CFG Long An bridge in Vietnam in 2023, about 196 t of steel, and two footbridges in Singapore. We do not have a US trail bridge reference yet.

Finish and owners 3 answers

Which finish lasts best on a trail?

Galvanizing needs the least care. Paint gives the colour a park often wants, and a duplex system combines both where the steel sees splash or salt. The owner sets the system.

Can a parks department use steel made in Vietnam?

Locally funded work usually can. Federally funded trail and highway grants often require steel produced in the United States, so check the funding terms before bidding.

Can several crossings ship together?

Yes. The plant fabricates 2,500 t of structural steel a month, so a greenway with many crossings can be fabricated as one program and marked crossing by crossing.

Keep reading

Related pages

Price it or partner with us

Send the crossing and the access limits.

Share the span, the deck, the trail width and the heaviest lift the site can take. We will price the bridge segment by segment.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details