Large-project capacity
Every crossing of a greenway, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
| Project | Sector | Where | Structural steel |
|---|---|---|---|
| Sunpro Steel Factory | Steel industry | Can Tho City, Vietnam · 2024 | 5,000 t |
| CPV Food Processing Factory | Food processing | Dong Nai Province, Vietnam · 2020 | 2,500 t |
| Long Son petrochemical | Oil and gas | Ba Ria–Vung Tau, Vietnam · 2022 | 2,000 t |
| M&D warehouse, Thailand | Warehouse and industrial | Thailand · 2024 | 2,000 t |
| Tongwei feed factory, phase 1 | Animal feed | Dong Thap Province, Vietnam · 2018 | 1,500 t |
| New Era cold storage, phase 1 | Cold storage, phase 1 tonnage | Tay Ninh Province, Vietnam | 1,000 t |
Pick the crossing
The span sets the form, and the form sets the shipping
Choose a crossing to see the bridge form that usually suits it and how it travels to the bank.
Short crossing
Beam or girder span
Two rolled or built-up girders with floor beams between them. A short span often ships whole in a 40 ft container or on a flat rack and goes in with one lift.
Creek or ravine
Pony truss
Low trusses on each side double as the handrail. The span ships in two or three segments with bolted splices fitted in our plant.
River or wetland
Through truss
Taller trusses with bracing overhead carry a longer span. It ships in more segments, each light enough for the crane the site can take.
Red dashed boxes are the bolted splices. The Engineer of Record sets the final form and span.
End of the trail
Getting a steel span to a bank with no road
Segments sized for the site
We size each segment to the lightest crane and the narrowest trail the contractor names, then place the splices to match.
Bolted, not welded on site
Every field joint is bolted with plates drilled in our plant, so no welding is needed at the creek.
Marked for the crossing
Each segment carries its crossing and position, so bundles for several bridges can share a container and still be sorted at the trailhead.
From our project files
CFG Long An bridge, about 196 t
A red steel truss bridge at a riverside site in Long An, Vietnam, fabricated in 2023. Its members were coated in our plant, and the trusses went up by mobile crane from the bank. We do not have a US trail bridge reference yet.
See the project
Photo
Photo
Photo
Photo
Weather and water
Three finishes for a park crossing
Galvanized
Hot-dip galvanizing by an outside galvanizer in Vietnam, for crossings that should need little care for many years.
Painted
A paint system in the colour the park wants, applied in our paint shop by painters trained by the paint maker.
Galvanized and painted
A duplex system where splash, de-icing salt or the park setting asks for both.
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Girders, trusses, floor beams, bracing and rails designed to the contract documents and the code the owner names
- Segments sized for the site access, with splices drilled and fitted in our plant
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Galvanizing by an outside galvanizer in Vietnam, or paint, and fabrication in our IAS AC472-accredited plant, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record and the owner
- Abutments, footings, bearings seats and any permits for the waterway
- Access to the bank, the crane and the lift
- Erection, deck boards or decking, approaches and landscaping
Questions from US contractors
Trail and park bridge steel: questions and answers
6 answers, grouped by topic.
Spans and delivery 3 answers
How do you get a bridge to a site with no road?
We cut the span into segments that the trail, the crane and the crew can handle, with bolted splices fitted in our plant. The contractor tells us the access limits and we design the splices around them.
What deck can the steel carry?
Timber boards, composite boards, grating or a concrete slab on metal deck. The floor beams are designed for the deck and the loads the owner sets, including maintenance vehicles where the trail allows them.
Have you built a bridge like this?
We fabricated the CFG Long An bridge in Vietnam in 2023, about 196 t of steel, and two footbridges in Singapore. We do not have a US trail bridge reference yet.
Finish and owners 3 answers
Which finish lasts best on a trail?
Galvanizing needs the least care. Paint gives the colour a park often wants, and a duplex system combines both where the steel sees splash or salt. The owner sets the system.
Can a parks department use steel made in Vietnam?
Locally funded work usually can. Federally funded trail and highway grants often require steel produced in the United States, so check the funding terms before bidding.
Can several crossings ship together?
Yes. The plant fabricates 2,500 t of structural steel a month, so a greenway with many crossings can be fabricated as one program and marked crossing by crossing.
Keep reading
Related pages
Price it or partner with us
Send the crossing and the access limits.
Share the span, the deck, the trail width and the heaviest lift the site can take. We will price the bridge segment by segment.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.