Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Willemstad · Area

Steel buildings and structural steel for Willemstad, Curaçao

Willemstad is Curaçao’s capital, with its World Heritage waterfront in Punda and Otrobanda, the restored districts of Scharloo and Pietermaai, the Schottegat harbour with the port, drydock and refinery area, and the airport at Hato.

Willemstad · Main place Willemstad

Main place
Willemstad
Group
Willemstad
Main towns
Punda, Otrobanda, Scharloo
Port
Port of Willemstad

Site conditions in Willemstad

What the site asks of your steel

Air
Harbour and industrial air
Wind
Steady trade winds
Ground
Fill around the harbour
Sites
Heritage rules in the old town

Our design note. Willemstad builds offices, hotels, public buildings, harbour works and warehouses. Heritage rules, galvanizing near the water and composite floors shape the steel.

Willemstad at a glance

The ground, the work and the road in

Ground and climate

Limestone, harbour fill and marine sediments around the Schottegat.

What gets built

Government, finance, healthcare, the port, industry, tourism and retail.

Getting steel there

The port of Willemstad is in the Schottegat.

Towns: Punda · Otrobanda · Scharloo · Pietermaai · Hato

Steel we recommend

What we fabricate for Willemstad

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Multi-storey buildings

Steel frames with composite deck for offices, hospitals, schools and apartments.

Multi-storey steel framing →

Industrial and marine works

Workshops, process buildings, pipe racks and crane bays for the harbour industries.

Manufacturing plants and crane bays →

Warehouses and logistics

Clear-span warehouses and distribution buildings near the harbour and the airport.

Warehouse and distribution buildings →

Contractors in Willemstad

You win the job in Willemstad. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Willemstad

Can you supply harbour and drydock works?

Yes. Workshops with crane bays, pipe racks, platforms and port warehouses, galvanized for the harbour.

Can you supply offices and hotels in Willemstad?

Yes. Composite steel frames with long spans, packed for tight town sites.

Willemstad

Areas across Curaçao

The capital and its harbour: Punda, Otrobanda, Scharloo and Pietermaai, the Schottegat with the port, drydock and industry, and the airport at Hato.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Curaçao. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Curaçao

Talk to us about steel for Willemstad

Send the drawings or the site, size and use. We design or detail the steel for Willemstad’s wind, flood and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port of Willemstad. WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.