Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Curaçao · Harbour and industry

Steel for Curaçao harbour and industrial works

The Schottegat, Willemstad’s deep inner harbour, is Curaçao’s industrial heart: the container port, a large ship repair drydock, warehouses and the old refinery area, whose future is still being decided. Harbour works need workshops with crane bays, pipe racks, platforms and storage buildings, all in harbour air. We fabricate them in our own plant and release them area by area.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Willemstad.

Tall lattice columns of a crane-served industrial building during erection
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Harbour
The Schottegat
Works
Port, drydock, refinery area
Steel
Crane bays, pipe racks
Capacity
2,500 t a month

What we fabricate

Steel for a working harbour

Crane bays

Runway girders and brackets, with overhead cranes on request.

Pipe racks

Multi-level racks for utilities and process lines, galvanized.

Platforms and stairs

Access platforms, stairs and handrail.

Port warehouses

Clear-span sheds and stores near the quays.

Workshops

Portal frames for marine and plant maintenance.

Utility buildings

Power, water and compressor buildings.

Built for the harbour

Heavy plate, galvanized where it counts

Our laser machines cut plate up to 100 mm thick and drill holes in the same pass, so heavy base plates, crane brackets and splice plates fit first time.

Open structures by the water corrode fastest. We galvanize or duplex coat pipe racks and platforms and record the coating for every member.

Who does what

Industrial work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Curaçao
  • Fabrication, galvanizing or coating and QC release
  • Crane girders, pipe racks, platforms and stairs
  • Packing by area and shipping to Willemstad
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and alignment
  • Mechanical and electrical works

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Curaçao has 3 areas. Open Bandabou, Willemstad or Bandariba to see the local wind, ground and coast, the road from Willemstad and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Curaçao project is cut, welded, inspected and packed.

Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.

Q&A

What Curaçaoan buyers ask

Can you supply crane bays for a harbour workshop?

Yes. Crane runway girders, brackets and stops fabricated with the frame, with overhead cranes on request.

Can you supply pipe racks and platforms?

Yes. Pipe racks, platforms, stairs and handrail, galvanized or duplex coated for the harbour.

What records come with the steel?

Mill certificates traced by heat, dimensional and coating records, and packing lists for every bundle.

Contact World Steel · Curaçao

Talk to us about steel for Curaçao

WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.