Curaçao · Hotels and public buildings

Steel for Curaçao hotels and public buildings

Tourism has grown fast in Curaçao: resorts on the south coast from Westpunt to Santa Barbara, hotels in the restored districts of Pietermaai and Otrobanda, and new projects around Mambo Beach and Jan Thiel. Willemstad builds offices, schools, healthcare and public buildings. A steel frame made off site and shipped in erection order shortens the time on site and suits tight old-town lots.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Willemstad.

Red multi-story process tower frame next to a feed mill
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Resorts
Westpunt to Santa Barbara
Hotels
Pietermaai, Otrobanda
Public
Offices, schools, healthcare
Capacity
2,500 t a month

Project types

What we fabricate for Curaçao

Hotels and resorts

Multi-storey frames for rooms, lobbies and restaurants.

Villas

Light frames packed per building.

Offices

Composite floors released floor by floor.

Schools

Classrooms and halls with long spans.

Healthcare

Composite frames with stiff floors for equipment.

Sports

Long-span roofs and stands.

Speed

A frame made while the foundations go in

We fabricate while your site builds the foundations, then ship building by building so tight sites never fill up with steel. Resorts that open for the season gain the most.

Large packages are released by building or by phase. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Who does what

Project work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Curaçao
  • Fabrication, coating and QC release
  • Composite deck, studs and secondary steel
  • Packing by building and shipping to Willemstad
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and concrete topping
  • Finishes, services and fit-out

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Curaçao has 3 areas. Open Bandabou, Willemstad or Bandariba to see the local wind, ground and coast, the road from Willemstad and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Curaçao project is cut, welded, inspected and packed.

Multi-story steel frame rising next to a fabrication hall
Going up beside the plant in Vietnam: World Steel framed its own office building.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.

Q&A

What Curaçaoan buyers ask

Can you supply a whole resort, building by building?

Yes. We release and pack each building as its own kit, in the order your site needs them.

Can steel suit a tight lot in Pietermaai or Otrobanda?

Yes. Light members lift in with small cranes, and frames can stand behind kept facades where the heritage rules allow.

Do you work with Curaçaoan contractors?

Yes. Contractors in Curaçao are our customers: they win the work and erect it, and we design, fabricate and supply the steel.