Why it matters
Two code families, one clear basis
European and American steel codes use different load factors, section tables and steel grades. Mixing them in one design causes delays at review. We agree one basis with your engineer before modeling and keep it on every sheet.
We fabricate to either family: European grades and sections, or ASTM grades and AISC design, with mill certificates traced by heat.
Design basis
What the steel design states
The items we confirm with your engineer of record in Curaçao before modeling.
| Item | What we state |
|---|---|
| Code family | Eurocode and NEN annexes, or IBC, ASCE 7 and AISC 360 |
| Wind | Basic wind speed and exposure set by your engineer |
| Seismic | Ground type and spectral values |
| Steel grades | EN 10025 grades or ASTM grades, as specified |
| Bolts and welds | To the same code family as the design |
Who does what
Permit work, split clearly
World Steel supplies
- Steel design or detailing to the code basis agreed for Curaçao
- Calculations and drawings for review
- Answers to plan-review comments on the steel in Curaçao
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Curaçao, the contractor and the engineer of record arrange
- The building permit
- Heritage approvals in the old town
- Geotechnical report and inspections
- Foundations
- Erection
Curaçao
What we do not claim
World Steel holds no licence or registration in Curaçao and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Curaçao.
Products and solutions
The World Steel pages behind this guide
Area by area
How this applies in your area
Curaçao has 3 areas. Open Bandabou, Willemstad or Bandariba to see the local wind, ground and coast, the road from Willemstad and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Curaçao project is cut, welded, inspected and packed.
Q&A
What Curaçaoan buyers ask
Who issues building permits in Curaçao?
The government of Curaçao, through its planning and building department. Your team files with the engineer or architect of record.
Can steel be used in the historic centre?
Often yes, behind or within facades and for new buildings that respect the old town. Your architect agrees height and appearance with the heritage authorities.
Can the design follow Eurocode?
Yes. We design and fabricate to Eurocode with European steel grades, or to US codes with ASTM grades, as your engineer specifies.
Curaçao solutions
Every Curaçao guide
Related pages
Code facts on this page summarize practice in Curaçao and the standards it references. They are not legal or engineering advice; your engineer of record and the planning and building department confirm the code and edition in force for your project.
Contact World Steel · Curaçao
Talk to us about steel for Curaçao
WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.