Two walls, two jobs
The high side and the low side
High side
- The taller column carries a larger moment and is usually the deeper member.
- A good wall for clerestory windows, high doors or signage.
- Where it meets an existing building, flashing and movement joints are detailed on the drawings.
Low side
- One gutter and one set of downspouts collect the whole roof.
- Gutter and downspouts are sized for local rainfall intensity.
- In snow country, snow slides and drifts are planned for at the low eave and any neighbor.
Three ways to use it
Stand-alone, lean-to or canopy
Stand-alone building
A narrow workshop, storage or utility building whose roof drains away from the street, a lot line or a neighbor.
Lean-to on another frame
A mono-slope bay hung off the side of a main gable building, sharing its column line.
Open canopy
A loading, parking or process canopy open on one or more sides, designed for wind blowing underneath.
A lean-to usually hangs off a clear-span gable frame. Adding to a building you already own? See expansions and add-ons.
Settled in design
Four things a mono-slope design gets right
Slope and drainage
Roof pitch chosen for the panel and the rainfall, with one gutter sized for the whole roof.
Wind from below
Open canopies see uplift from wind under the roof. Frames, purlins and anchors are checked for it.
Drifting snow
A low roof against a tall wall collects drifting snow. ASCE 7 drift loads are added where they apply.
The joint with the existing building
If the frame leans on another structure, its loads and movement are coordinated with that building’s engineer.



Members with end plates, primed columns and coated frame parts in the World Steel plant, Vietnam.
From our company profile
Mono-slope frame - without interior columns
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Questions
Mono-slope frame questions
When is a mono-slope frame better than a gable frame?
When the roof must drain to one side, when the building leans against another structure, or when it is narrow enough that a single rafter is efficient. For wide buildings a gable frame usually uses less steel.
Can a mono-slope lean-to be added to an existing metal building?
Often, yes, but the existing frame must be checked for the new loads. We design the lean-to and give the loads at the connection to your Engineer of Record, who confirms the existing building can take them.
What roof slope does a mono-slope building need?
Enough for the roof panel to drain reliably, which depends on the panel type and its laps. We choose the slope with the panel and the gutter, not separately.
How is an open canopy different from a closed building?
Wind can get under an open canopy and lift it, and there are no walls to brace it. The frame, purlins and anchor rods are designed for those uplift and sway forces.
Does all the rain really go to one gutter?
Yes. That is the point of the frame, so the low-side gutter and downspouts are sized for the full roof area and the local rainfall intensity.
Built for large jobs
Mono-slope frames for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included