Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Thomas · Island

Steel buildings and structural steel for St Thomas, US Virgin Islands

St Thomas is the territory’s capital island, with Charlotte Amalie and its cruise harbour, the Crown Bay cargo terminal, the airport, resorts on the east end and homes on steep hills all round. Irma crossed the island in September 2017.

St Thomas and St John · Main town Charlotte Amalie

Main town
Charlotte Amalie
Group
St Thomas and St John
Main towns
Charlotte Amalie, Crown Bay, Red Hook
Port
Crown Bay, St Thomas

Site conditions in St Thomas

What the site asks of your steel

Wind
Hillside speed-up
Seismic
Plate boundary
Surge
Harbour front
Air
Harbour spray

Our design note. St Thomas builds its hospital, schools, hotels and utility buildings on steep, tight sites. Hillside wind design, stepped bases and galvanized steel at the harbour shape the job.

St Thomas at a glance

The ground, the work and the road in

Ground and climate

Steep volcanic rock, with fill and marine sediments along the harbour.

What gets built

Government, tourism and cruise ships, healthcare, retail and the port.

Getting steel there

Crown Bay cargo terminal on the island.

Towns: Charlotte Amalie · Crown Bay · Red Hook · Bovoni · Frenchtown

Steel we recommend

What we fabricate for St Thomas

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Multi-storey buildings

Steel frames with composite deck for hospitals, schools, offices and housing.

Multi-storey steel framing →

Resorts and villas

Hotel buildings, villas, restaurants and long-span lobbies on the coast.

Multi-story steel buildings →

Energy and utilities

Power plant buildings, solar canopies, substations, tank and pipe supports.

Energy and power utilities →

Contractors in St Thomas

You win the job in St Thomas. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Thomas

Can you supply hospital and school buildings on St Thomas?

Yes. Composite steel frames designed to the risk category your engineer sets, released building by building.

How do you handle steep sites on St Thomas?

With stepped bases, light members and splices sized for the hill roads; your engineer designs the retaining walls and foundations.

St Thomas and St John

Other islands: st thomas and st john

The district of St Thomas and St John: Charlotte Amalie, the cruise and cargo harbour, the airport, and the national park island of St John across Pillsbury Sound.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the US Virgin Islands. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · US Virgin Islands

Talk to us about steel for St Thomas

Send the drawings or the site, size and use. We design or detail the steel for St Thomas’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Crown Bay, St Thomas. WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.