Ground types
What lies under the site
Your geotechnical engineer confirms the ground for each site.
| Area | Typical ground | What it means for steel |
|---|---|---|
| St Thomas and St John hills | Weathered volcanic rock on steep slopes | Stepped bases, rock anchors, slope checks |
| Harbour fronts | Fill over marine sediments | Piles or ground improvement by site |
| St Croix central plain | Alluvium and limestone | Shallow foundations on firm ground |
| St Croix south shore | Low ground and fill near the port | Soft site classes, surge and flood levels |
Seismic frames
How we detail for earthquakes
Moment frames
Portal and multi-bay frames for warehouses, halls and terminals.
Braced frames
Efficient bracing for hospitals, schools and hotels.
AWS D1.8 welding
Qualified procedures and welders for demand-critical welds.
Stepped base plates
Base plates and anchors for sloping sites and uplift.
Who does what
Ground and seismic work, split clearly
World Steel supplies
- Frames detailed to AISC 341 where the design calls for it
- Column reactions for the foundation design
- Base plates, anchor bolt plans and templates
- Plate with EN 10204 3.1 certificates on request
- Remote or in-person inspector access
In US Virgin Islands, the contractor and the engineer of record arrange
- Geotechnical investigation
- Site class and seismic design category
- Retaining walls and foundations
- Special inspections on site
- Erection to the drawings
Products and solutions
The World Steel pages behind this guide
Island by island
How this applies in your island
The US Virgin Islands have 3 islands. Open St Thomas, St John or St Croix to see the local wind, ground and coast, the road from St Thomas and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your USVI project is cut, welded, inspected and packed.
Q&A
What Virgin Islander buyers ask
Are the Virgin Islands at risk from earthquakes and tsunamis?
Yes. The 1867 earthquake brought a tsunami to the harbours. Design follows the seismic values your engineer sets from the code and the soil report.
Does a steep lot suit a steel frame?
Yes. Light members and stepped bases suit steep, tight lots, and the frame can be lifted in pieces with small cranes.
Why steel in the Virgin Islands?
A steel frame is light, fast to erect and ductile, and it comes complete from one plant, which suits islands where almost every material is imported.
US Virgin Islands solutions
Every US Virgin Islands guide
Related pages
Code facts on this page summarize practice in the US Virgin Islands and the standards it references. They are not legal or engineering advice; your engineer of record and DPNR confirm the code and edition in force for your project.
Contact World Steel · US Virgin Islands
Talk to us about steel for the US Virgin Islands
WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.