Project types
What we fabricate for the Virgin Islands
Hospitals and clinics
Composite frames with stiff floors for equipment.
Schools
Classrooms and halls designed to the shelter risk category.
Resorts and hotels
Multi-storey frames for rooms, lobbies and restaurants.
Villas and housing
Light frames packed per building for steep lots.
Power and water
Plant buildings, pipe racks and tank supports.
Airport buildings
Terminal, hangar and cargo frames.
Speed
A small crew, a big programme
We fabricate while your site builds the foundations, then ship building by building so tight hillside sites never fill up with steel. Schools that must reopen for the term and resorts that must open for the season gain the most.
Large programmes are released by building or by phase. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Virgin Islands building code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by building and shipping to the islands
- Shop and erection drawings, included
The contractor arranges
- Owner contract and permits
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Island by island
How this applies in your island
The US Virgin Islands have 3 islands. Open St Thomas, St John or St Croix to see the local wind, ground and coast, the road from St Thomas and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your USVI project is cut, welded, inspected and packed.
Q&A
What Virgin Islander buyers ask
Can you supply a programme of school and hospital buildings?
Yes. We release packages building by building from one plant, with one set of drawings and one tracking system.
Can a steel frame help a resort reopen on time?
Yes. Members are made while foundations are built, and the frame goes up much faster than cast concrete.
Do you work with Virgin Islands contractors?
Yes. Contractors in the US Virgin Islands are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
US Virgin Islands solutions
Every US Virgin Islands guide
Related pages
Code facts on this page summarize practice in the US Virgin Islands and the standards it references. They are not legal or engineering advice; your engineer of record and DPNR confirm the code and edition in force for your project.
Contact World Steel · US Virgin Islands
Talk to us about steel for the US Virgin Islands
WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.