US Virgin Islands · Code and permits

Structural steel and the US Virgin Islands building code

The US Virgin Islands use a building code based on the International Building Code, with local amendments. Building permits are issued by the Department of Planning and Natural Resources (DPNR), and projects on the shore may also need a Coastal Zone Management permit. Your engineer of record sets the code basis, the wind speed and the seismic values. We state that basis on the first sheet of our calculations, so the review starts from the same page.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St Thomas.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Code
IBC-based territorial code
Permits
DPNR
Shoreline
Coastal Zone Management
Our part
Basis stated on sheet one

Why it matters

A US code basis on steep, storm-struck islands

The territory uses the same family of codes as the US mainland, so the design language is familiar to engineers, owners and lenders. What changes is the site: steep hills that speed up the wind, seismic loads from the plate boundary, and salt air everywhere.

We design to the basis your engineer of record sets and keep it on every sheet: the code edition, the wind speed and risk category, the topographic factor, the seismic values and the steel design standards.

Design basis

What the steel design states

The items we confirm with your engineer of record in the US Virgin Islands before modeling.

ItemWhat we state
CodeThe territorial code and the IBC edition it is based on
WindBasic wind speed, exposure, risk category and topographic factor
SeismicSite class, spectral values and seismic design category
FloodFloor levels and surge loads set by your engineer
SteelAISC 360 design, AISC 341 where seismic detailing applies

Who does what

Permit work, split clearly

World Steel supplies

  • Steel design or detailing to the Virgin Islands building code
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in the US Virgin Islands
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In US Virgin Islands, the contractor and the engineer of record arrange

  • The DPNR building permit
  • Coastal Zone Management permit where needed
  • Geotechnical report and site class
  • Inspections on site and foundations
  • Erection

US Virgin Islands

What we do not claim

World Steel holds no licence or registration in the Virgin Islands and does not seal drawings or apply for permits. The engineer of record approves the design and your team files it.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The US Virgin Islands have 3 islands. Open St Thomas, St John or St Croix to see the local wind, ground and coast, the road from St Thomas and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your USVI project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Virgin Islander buyers ask

Who issues building permits in the US Virgin Islands?

The Department of Planning and Natural Resources (DPNR). Your team files with the engineer or architect of record.

Do shoreline projects need another permit?

Often yes: a Coastal Zone Management permit for work in the coastal zone. Your team confirms which permits the site needs.

Do you supply drawings for the permit set?

We supply the steel calculations and drawings your engineer needs. The permit application itself is made by your team.