Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Croix · Island

Steel buildings and structural steel for St Croix, US Virgin Islands

St Croix is the largest island of the territory, about 64 km south of St Thomas, with the Danish towns of Christiansted and Frederiksted, the airport, farms on the central plain, the south shore port and a large industrial area.

St Croix · Main town Christiansted

Main town
Christiansted
Group
St Croix
Main towns
Christiansted, Frederiksted, Kingshill
Port
the south shore port of St Croix

Site conditions in St Croix

What the site asks of your steel

Wind
Open Atlantic coast
Seismic
Plate boundary
Surge
Low south shore
Air
Salt spray

Our design note. St Croix builds its hospital, schools, industrial and port buildings, and resorts on the north shore. Hurricane design, galvanizing on the south shore and composite floors shape the steel.

St Croix at a glance

The ground, the work and the road in

Ground and climate

Limestone, alluvial plains and hills, low fill on the south shore.

What gets built

Healthcare, government, industry, the port, agriculture and tourism.

Getting steel there

South shore container port on the island.

Towns: Christiansted · Frederiksted · Kingshill · Krause Lagoon

Steel we recommend

What we fabricate for St Croix

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Industrial and utility buildings

Process buildings, pipe racks, workshops, water and power plant buildings.

Manufacturing plants and crane bays →

Multi-storey buildings

Steel frames with composite deck for hospitals, schools, offices and housing.

Multi-storey steel framing →

Warehouses and logistics

Clear-span warehouses and stores for imported food and building supplies.

Warehouse and distribution buildings →

Contractors in St Croix

You win the job in St Croix. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Croix

Can you supply industrial and pipe rack steel on St Croix?

Yes. Process buildings, pipe racks, platforms and tank supports, galvanized or coated for the south shore.

Can steel ship straight to St Croix?

Yes, to the container port on the south shore, so St Croix sites do not wait on St Thomas.

St Croix

Islands across the US Virgin Islands

The district of St Croix, the largest island, about 64 km south: Christiansted and Frederiksted, the airport, farms, the south shore port and the industrial area.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the US Virgin Islands. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · US Virgin Islands

Talk to us about steel for St Croix

Send the drawings or the site, size and use. We design or detail the steel for St Croix’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to the south shore port of St Croix. WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.