Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

US Virgin Islands · Hurricanes

Hurricane-resistant steel buildings for the US Virgin Islands

Hugo struck St Croix in 1989 and Marilyn struck St Thomas in 1995. In September 2017 Irma crossed St Thomas and St John, and Maria passed close to St Croix soon after. On St Thomas and St John most buildings sit on steep hills that speed up the wind; on St Croix the coasts are open. Most damage starts at the roof edge or a failed opening. We design the whole load path for the wind your engineer sets, from cladding to anchor bolts.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St Thomas.

Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Storms
Hugo, Marilyn, Irma, Maria
Critical zones
Roof edges and openings
Hills
Wind speed-up
Our part
Load path checked end to end

Where storms win

Four places we check first

Roof uplift

On roofs in the US Virgin Islands, edge and corner zones carry much more suction than the middle.

Large openings

A failed door or window pressurizes the building; we design for it.

Hillside speed-up

Ridges and steep slopes raise wind loads; your engineer sets the topographic factor.

Connections

Purlin cleats, flange braces and anchors carry reversing storm loads.

By island

How the island changes the loads on your steel

Your engineer of record confirms the values for each site.

SiteWhat changes
St Thomas hillsidesSteep slopes and ridges speed up the wind
Charlotte Amalie waterfrontHarbour surge and spray
St JohnSteep lots, small roads, open bays
St Croix north shoreOpen Atlantic exposure
St Croix south shoreLow ground, surge at the port and industrial area

Critical buildings

Buildings that must keep working

Hospitals

Higher risk categories and stiff frames for equipment.

Schools and shelters

Halls and classrooms designed to the shelter risk category.

Power and water

Steel for generators, desalination plants and tanks sized for storm loads.

US Virgin Islands

What we do not claim

We do not publish wind ratings or certify buildings in the US Virgin Islands for a hurricane category. The design is checked by your engineer of record for the loads set for your site in the US Virgin Islands.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The US Virgin Islands have 3 islands. Open St Thomas, St John or St Croix to see the local wind, ground and coast, the road from St Thomas and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your USVI project is cut, welded, inspected and packed.

Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Built-up members with welded stiffeners and drilled clip plates on shop supports
Stiffeners and drilled clip plates welded on, World Steel plant in Vietnam.

Q&A

What Virgin Islander buyers ask

What did Irma and Maria teach builders in the Virgin Islands?

That roofs and openings fail first, that hillside sites see higher winds, and that a continuous load path from cladding to foundations keeps a building standing.

Is steel a good choice after 2017?

Yes. Steel frames are designed for reversing wind loads, go up fast and come complete from one plant, which helps islands rebuild quickly.

Do you supply roof and wall cladding too?

Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in the US Virgin Islands.

Contact World Steel · US Virgin Islands

Talk to us about steel for the US Virgin Islands

WhatsApp, email or a video call with our engineers, booked at an hour that suits Charlotte Amalie. Our contact page for the US Virgin Islands has the ports, the local time and the form.