Exposure
Matching the system to the site
Typical choices for Montserrat, confirmed with your engineer for each project.
| Site | Typical protection |
|---|---|
| Inland, enclosed building | Zinc-rich primer and finish coat on sheltered steel |
| Brades, Salem and hill towns | Zinc-rich primer, epoxy intermediate, polyurethane finish |
| Little Bay and the coast | Marine-grade high-build system or duplex |
| Open roofs and canopies | Hot-dip galvanizing or duplex for ash and salt |
| Port and fuel facilities | Duplex systems for splash and spray |
In our plant
How coating quality is built in
Blast cleaning
Members for Montserrat are blast cleaned to the specified grade before priming.
Trained painters
Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Montserrat.
Measured film
Dry film thickness measured and recorded for every member shipped to Montserrat.
Brands sold locally
Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Montserrat can buy them for touch-up.
Montserrat
After erection
Every bundle shipped to Little Bay carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product. Washing ash off exposed steel after a fall helps any coating last.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Montserrat has 3 parishes. Open St Peter, St Georges or St Anthony to see the local wind, ground and coast, the road from Little Bay and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Montserrat project is cut, welded, inspected and packed.
Q&A
What Montserratian buyers ask
Does volcanic ash damage steel?
Wet ash is acidic and abrasive, so it attacks thin or damaged coatings. Galvanizing or a duplex system, and washing ash off, protect exposed steel.
Should all steel be galvanized?
Not always. Enclosed steel takes a lighter system; exposed and coastal steel often gets galvanizing or a duplex system. Your engineer and the owner set it.
Can we buy matching touch-up paint?
Yes. The brands we use are sold across the Caribbean, and each shipment to Little Bay names the products.
Montserrat solutions
Every Montserrat guide
Related pages
Code facts on this page summarize practice in Montserrat and the standards it references. They are not legal or engineering advice; your engineer of record and the Physical Planning Unit confirm the code and edition in force for your project.
Contact World Steel · Montserrat
Talk to us about steel for Montserrat
WhatsApp, email or a video call with our engineers, booked at an hour that suits Brades. Our contact page for Montserrat has the ports, the local time and the form.