Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Peter · Parish

Steel buildings and structural steel for St Peter, Montserrat

St Peter is the north of Montserrat and now home to almost all of its people. It holds Brades, the seat of government, the new town and Port Little Bay, the hospital at St John’s, John A. Osborne Airport at Gerald’s and the villages of Salem, Look Out and Davy Hill.

The north · Main town Brades

Main town
Brades
Group
The north
Main towns
Brades, Little Bay, Salem
Port
Port Little Bay

Site conditions in St Peter

What the site asks of your steel

Wind
Hills and open bays
Seismic
Lesser Antilles arc
Ash
When the wind turns north
Air
Coastal salt

Our design note. St Peter is where Montserrat builds: the Little Bay town centre, government offices, the hospital, schools and housing. Wind design for hilltops, seismic detailing and roofs checked for ash shape the steel.

St Peter at a glance

The ground, the work and the road in

Ground and climate

Older volcanic hills and ridges cut by ghauts, with coastal flats at Little Bay and Carr’s Bay.

What gets built

Government, the port, commerce, health, education, housing and tourism.

Getting steel there

Port Little Bay is in the parish; every site is a short drive.

Towns: Brades · Little Bay · Salem · Look Out · St John’s

Steel we recommend

What we fabricate for St Peter

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Town centre buildings

Shops, offices, markets and mixed-use blocks for the new town at Little Bay.

Commercial steel buildings →

Multi-storey buildings

Steel frames with composite deck for government offices, clinics and apartments.

Multi-storey steel framing →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in St Peter

You win the job in St Peter. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Peter

Can you supply buildings for the Little Bay town centre?

Yes. Shops, offices, mixed-use and public building frames, a short haul from the port.

Can you supply airport buildings at Gerald’s?

Yes. Terminal, hangar and cargo frames designed for the wind your engineer sets.

The north

Parishes across Montserrat

St Peter, where almost everyone now lives: Little Bay, Brades, Salem, Look Out and the airport at Gerald’s.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Montserrat. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Montserrat

Talk to us about steel for St Peter

Send the drawings or the site, size and use. We design or detail the steel for St Peter’s hurricane, volcanic and seismic conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port Little Bay. WhatsApp, email or a video call with our engineers, booked at an hour that suits Brades. Our contact page for Montserrat has the ports, the local time and the form.