Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Anthony · Parish

Steel buildings and structural steel for St Anthony, Montserrat

St Anthony is the south of Montserrat, around the Soufrière Hills volcano. Plymouth, the old capital, was buried by pyroclastic flows and mud from 1995, the old airport at Bramble was destroyed, and the parish lies almost entirely within the exclusion zone.

The south and the volcano · Main town Plymouth

Main town
Plymouth
Group
The south and the volcano
Main towns
Plymouth, Soufrière Hills, Bramble
Port
Port Little Bay

Site conditions in St Anthony

What the site asks of your steel

Volcano
Soufrière Hills
Zone
Exclusion zone
Ash
Frequent ash fall
Seismic
Volcanic earthquakes

Our design note. New building in Montserrat happens in the north, not in St Anthony. Any work near the zone, such as monitoring or utility structures, follows access rules set by the authorities, and the design follows the hazards your engineer sets.

St Anthony at a glance

The ground, the work and the road in

Ground and climate

The active volcano, pyroclastic and mudflow deposits, and buried towns.

What gets built

Volcano monitoring and limited, controlled access only.

Getting steel there

Access is controlled by the government on the advice of the Montserrat Volcano Observatory.

Towns: Plymouth · Soufrière Hills · Bramble · Richmond Hill

Steel we recommend

What we fabricate for St Anthony

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Workshops and utilities

Portal frames for workshops, depots, water works and power plant buildings.

Manufacturing plants and crane bays →

Energy and utilities

Geothermal and power plant buildings, solar carports, tank and pipe supports.

Energy and power utilities →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in St Anthony

You win the job in St Anthony. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Anthony

Can steel buildings go up in St Anthony?

Not in the exclusion zone. Any work there is controlled by the government on the advice of the Montserrat Volcano Observatory.

Where do Montserrat projects go instead?

To the north, in St Peter and the open parts of St Georges, where we supply the steel.

The south and the volcano

Parishes across Montserrat

St Anthony, with buried Plymouth and the Soufrière Hills, almost all inside the exclusion zone.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Montserrat. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Montserrat

Talk to us about steel for St Anthony

Send the drawings or the site, size and use. We design or detail the steel for St Anthony’s hurricane, volcanic and seismic conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Port Little Bay. WhatsApp, email or a video call with our engineers, booked at an hour that suits Brades. Our contact page for Montserrat has the ports, the local time and the form.