Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St George · Parish

Steel buildings and structural steel for St George, Grenada

St George holds the capital, its horseshoe harbour and Fort George, the Grand Anse beach and resorts, the university campus at True Blue and Maurice Bishop International Airport at Point Salines. Most of Grenada’s commerce and building happens here.

South · Parish · Main town St George’s

Main town
St George’s
Group
South
Main towns
St George’s, Grand Anse, True Blue
Port
St George’s

Site conditions in St George

What the site asks of your steel

Wind
Hills and open south coast
Seismic
Lesser Antilles arc
Ground
Slopes and fill
Air
Beach and harbour salt

Our design note. St George builds resorts, campus buildings, offices and warehouses within a short haul of the port. Wind design for hills and coast, seismic detailing and marine coatings shape the steel.

St George at a glance

The ground, the work and the road in

Ground and climate

Steep volcanic hills around the harbour; lower slopes, sand and flats along the south-west coast.

What gets built

Government, the port, tourism, the university, offices, retail, warehouses and housing.

Getting steel there

The Port of St George’s is in the parish; the south coast is a short haul.

Towns: St George’s · Grand Anse · True Blue · Point Salines · Morne Jaloux

Steel we recommend

What we fabricate for St George

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and hotels

Hotel blocks, villas, long-span lobbies and restaurant roofs for tourism.

Multi-story steel buildings →

Multi-storey buildings

Steel frames with composite deck for offices, campus buildings, apartments and clinics.

Multi-storey steel framing →

Warehouses and logistics

Clear-span warehouses and distribution buildings for imports, food and building supplies.

Warehouse and distribution buildings →

Contractors in St George

You win the job in St George. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St George

Can you supply resort buildings on Grand Anse?

Yes. Hotel frames, villas and long-span lobbies, with marine coatings for the beachfront.

Can you supply hangars at the airport?

Yes. Long-span hangar and cargo frames, with large door openings designed into the wind case.

South

Other parishes: south

St George with the capital, the port, the airport and Grand Anse, and St David on the south-east coast.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Grenada. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Grenada

Talk to us about steel for St George

Send the drawings or the site, size and use. We design or detail the steel for St George’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to St George’s. WhatsApp, email or a video call with our engineers, booked at an hour that suits St George’s. Our contact page for Grenada has the ports, the local time and the form.