Why it matters
International Code practice, island loads
Because the Cayman code follows the International Codes, the steel design uses the same AISC and ASCE references US engineers use every day. What changes is the island: wind exposure on open coasts, surge on low ground and salt air everywhere.
Office, hotel and institutional owners often add their own specifications. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.
Design basis
What the steel design states
The items we confirm with your engineer of record in the Cayman Islands before modeling.
| Item | What we state |
|---|---|
| Code | The Cayman Islands Building Code and the editions it references |
| Wind | Basic wind speed, exposure and risk category |
| Flood | Floor levels and surge loads set by your engineer |
| Seismic | Site class, spectral values and seismic design category |
| Steel | AISC 360 design, AISC 341 where seismic detailing applies |
Who does what
Permit work, split clearly
World Steel supplies
- Steel design or detailing to the Cayman Islands Building Code
- Calculations and drawings for review
- Answers to plan-review comments on the steel in the Cayman Islands
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Cayman Islands, the contractor and the engineer of record arrange
- Planning permission and building permit
- Geotechnical report and site class
- Inspections on site
- Foundations
- Erection
Cayman Islands
What we do not claim
World Steel holds no approval, licence or registration in the Cayman Islands and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in the Cayman Islands.
Products and solutions
The World Steel pages behind this guide
District by district
How this applies in your district
The Cayman Islands have 6 districts. Open George Town, West Bay or Bodden Town to see the local wind, ground and coast, the road from George Town and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Cayman Islands project is cut, welded, inspected and packed.
Q&A
What Caymanian buyers ask
Who issues building permits in the Cayman Islands?
Building control in the Department of Planning issues permits after planning permission. Your team files with the engineer or architect of record.
Are the Sister Islands different?
Planning on Cayman Brac and Little Cayman goes to the Development Control Board. The building code is the same.
Does the Cayman code use US standards?
It is based on the International Codes, so the IBC, ASCE 7 and AISC 360 framework applies. Your engineer of record sets the exact editions.
Cayman Islands solutions
Every Cayman Islands guide
Related pages
Code facts on this page summarize practice in the Cayman Islands and the standards it references. They are not legal or engineering advice; your engineer of record and the planning and building control authorities confirm the code and edition in force for your project.
Contact World Steel · Cayman Islands
Talk to us about steel for the Cayman Islands
WhatsApp, email or a video call with our engineers, booked at an hour that suits George Town. Our contact page for the Cayman Islands has the ports, the local time and the form.