Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Cayman Islands · Coatings

Coatings for steel in the Cayman Islands’ salt air

No site in the Cayman Islands is far from the sea. Towers on Seven Mile Beach face open water, the south coast takes spray in every storm, and the trade winds carry salt across the whole of Grand Cayman and the Sister Islands. For the Cayman Islands we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to George Town.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Beachfront
Open sea exposure
Everywhere
Salt in the wind
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for the Cayman Islands, confirmed with your engineer for each project.

SiteTypical protection
Enclosed, air-conditioned buildingZinc-rich primer and finish coat on sheltered steel
George Town and inland sitesZinc-rich primer, epoxy intermediate, polyurethane finish
Seven Mile Beach and beachfrontMarine-grade high-build system or duplex
East End, North Side and the BracHot-dip galvanizing or duplex systems
Marinas and docksDuplex systems for splash and spray

In our plant

How coating quality is built in

Blast cleaning

Members for the Cayman Islands are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for the Cayman Islands.

Measured film

Dry film thickness measured and recorded for every member shipped to the Cayman Islands.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in the Cayman Islands can buy them for touch-up.

Cayman Islands

After erection

Every bundle shipped to George Town carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

District by district

How this applies in your district

The Cayman Islands have 6 districts. Open North Side, East End or Cayman Brac and Little Cayman to see the local wind, ground and coast, the road from George Town and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Cayman Islands project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Caymanian buyers ask

Does steel inside a building need marine coatings?

Usually less: enclosed, air-conditioned steel takes a lighter system than steel exposed to the weather. Your engineer and the owner set it.

Should beachfront steel be galvanized?

Exposed steel close to the sea often is, or gets a duplex system for the longest life.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to George Town names the products.

Contact World Steel · Cayman Islands

Talk to us about steel for the Cayman Islands

WhatsApp, email or a video call with our engineers, booked at an hour that suits George Town. Our contact page for the Cayman Islands has the ports, the local time and the form.