Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection · Polyurethane coatings

The color that stays when the sun comes out

Exposed steel is seen every day: canopy frames, entrance structures, stair towers, open hangars. The finish coat has to keep its color and gloss in hard sunlight and shed weather. Polyurethane does both. We apply it over the primer and epoxy in our plant, in the color your architect chooses.

A navy painted steel beam in sunlight with a highlight moving across its glossy finish
IllustrationColor per your architect.

Color

Any color your architect picks

  • Navy
  • Red
  • Light grey
  • Dark grey
  • White
  • Charcoal

Examples only. Colors confirmed with the coating manufacturer per project.

Why it pays

Steel that still looks new

  • Looks right longer

    Color and gloss hold in the sun.

  • Weather barrier

    Top layer of the system.

  • Your color

    Chosen by your architect.

  • Touch-up included

    For site handling marks.

  1. Color chosenBy your architect.
  2. AppliedOver the epoxy.
  3. Protected for shippingPacked to limit damage.

Specification

Polyurethane at a glance

Coating
Polyurethane finish coat from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP)
Role
Color and gloss that hold in sunlight; weather barrier
Color
To the color your architect specifies, confirmed per project
Under it
Zinc-rich primer and epoxy, or galvanizing in a duplex system
Application
Airless spray in our plant
Touch-up
Matching touch-up paint shipped for site repairs
Coated frame parts with welded brackets in the paint hallPhoto
Pair of red truss assemblies with bolted connection plates inside the shopPhoto

Finish coats you can match anywhere

Six international brands, one color matched on site

Our polyurethane finish coats come from worldwide paint brands. When a member is scuffed in transit or during erection, the US contractor can buy the same product and color locally, so the touch-up matches and the coating system stays one manufacturer’s system.

  • JotunNorway
  • PPGUnited States
  • CarbolineUnited States
  • HempelDenmark
  • Nippon PaintJapan
  • International PaintUnited Kingdom
Bought near the jobSold through each brand’s US distributors.
Same product, same colorNamed on the coating schedule we send.
Certified paintersTrained and certified by the paint manufacturer.

Brand names are trademarks of their owners and are named only to show the coating systems we apply. No partnership or endorsement is implied. The product on each project is the one named in its coating schedule. Surface preparation follows SSPC standards, read with the paint data sheet.

Questions

Finish coat questions

Can you match a specific color?

Yes, to the color your architect specifies, confirmed with the coating manufacturer per project.

What about scratches during shipping and erection?

We pack to limit damage and ship matching touch-up paint. Your contractor touches up handling marks after erection.

Is polyurethane needed indoors?

Not usually. Indoors, epoxy or a simpler system is often enough. Polyurethane earns its place where steel sees sunlight.

Who applies the polyurethane?

Our own painters, trained and certified by the paint manufacturer, in our paint shop. The coating products we use carry UL certification.

Can the finish color be matched on site in the US?

Yes. Our finish coats come from Jotun, PPG, Carboline, Hempel, Nippon Paint or International Paint (IP). The product and color are named on the coating schedule, and the US contractor can buy the same product from the brand’s US distributors for touch-up.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Polyurethane Coatings

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Members in gray finish paint laid out in the paint hall Photo

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.