Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Insulation & building performance · Thermal breaks

Stop the cold where the steel touches

In a metal building, the insulation gets squeezed flat wherever the panel crosses a purlin or girt. Those lines leak heat, and in cold weather they show up as cold stripes and condensation. A thermal break strip on top of each purlin or girt puts a layer back where it was lost. We size the strips with your energy design and ship them with the framing.

Two details: insulation crushed over a purlin lets heat through; a thermal break strip keeps a layer in place Without a break With a thermal break
IllustrationNot to scale. Values come from your energy design.

The difference

One strip, one less cold line

Without a breakInsulation crushed to almost nothing over every purlin. Heat flows through the steel.
With a breakA strip keeps a layer between panel and purlin. The cold line is reduced.
  • Fewer cold lines

    Less heat lost through the framing.

  • Less condensation

    Warmer inside surfaces at purlins.

  • Helps the energy design

    Fits the assembly your designer chose.

  • Right screws shipped

    Fasteners sized for the strip.

How it is planned

Sized with the framing

  1. Energy designYour designer sets the assembly.
  2. Strips sizedWidth and thickness per framing line.
  3. Shipped with screwsLonger fasteners included.

Specification

Thermal breaks at a glance

TypeRigid or foam strips between panel and framing
LocationTop of purlins and outside face of girts
FasteningPanel screws sized for the extra thickness
Standing seamCoordinated with clip heights where clips are used
PerformanceSet by the energy design; values confirmed per project
SupplyWith the purlins, girts and insulation

Questions

Thermal break questions

Do I need thermal breaks?

Many energy codes and assemblies for conditioned metal buildings use them. Your designer decides from the energy design; we supply what the assembly calls for.

Do thermal breaks change the screws?

Yes. The panel screws must be longer to pass through the strip, so we size and ship them together.

Can you tell me the R-value gain?

Not as a general number. It depends on the assembly; values come from the energy design and the maker’s data for the chosen strip.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Thermal Breaks

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of insulation & building performance, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.