Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sint Maarten · Coatings

Coatings for steel in Sint Maarten’s salt air

No site on the Dutch side is more than a few kilometres from the sea. Marinas line Simpson Bay Lagoon, hotels sit on the beaches at Maho, Cupecoy and Dawn Beach, the port takes spray at Pointe Blanche and Philipsburg sits between Great Bay and the Great Salt Pond. For Sint Maarten we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Pointe Blanche.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Lagoon
Marinas and spray
Everywhere
Salt in the wind
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Sint Maarten, confirmed with your engineer for each project.

SiteTypical protection
Enclosed, air-conditioned buildingZinc-rich primer and finish coat on sheltered steel
Hillside and inland sitesZinc-rich primer, epoxy intermediate, polyurethane finish
Beachfront hotelsMarine-grade high-build system or duplex
Lagoon marinas and the portHot-dip galvanizing or duplex systems
Open structures and canopiesHot-dip galvanizing with a finish coat

In our plant

How coating quality is built in

Blast cleaning

Members for Sint Maarten are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Sint Maarten.

Measured film

Dry film thickness measured and recorded for every member shipped to Sint Maarten.

Brands sold in the region

Jotun, PPG, Carboline, Hempel, Nippon and International Paint, for easy touch-up.

Sint Maarten

After erection

Every bundle shipped to Pointe Blanche carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Sint Maarten has 5 areas. Open Dutch Quarter and the east, Simpson Bay and the Lowlands or Cole Bay to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.

Q&A

What St. Maartener buyers ask

Is any site in Sint Maarten away from the salt?

Not really. Hillside sites take less spray than the bays, but the trade winds carry salt over the whole island.

Should marina steel be galvanized?

Exposed steel at the lagoon and the port often is, or gets a duplex system for the longest life.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Pointe Blanche names the products.

Contact World Steel · Sint Maarten

Talk to us about steel for Sint Maarten

WhatsApp, email or a video call with our engineers, booked at an hour that suits Philipsburg. Our contact page for Sint Maarten has the ports, the local time and the form.