Sint Maarten · Permits and codes

Structural steel and Sint Maarten’s building permits and codes

A new building in Sint Maarten needs a building permit from VROMI, the Ministry of Public Housing, Spatial Planning, Environment and Infrastructure. After Irma, wind and roof design came under closer review. Many owners, lenders and engineers on the island work with US codes, others with Eurocode. Your engineer of record agrees the basis with the ministry; we design to it and state it on the first sheet of our calculations.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Pointe Blanche.

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Permits
VROMI
Codes
US codes or Eurocode
Design basis
Set by your engineer
Our part
Basis stated on sheet one

Why it matters

One basis, stated once

On a small island the reviewer, the engineer and the contractor often meet across the same table. A design that states its code, loads and materials on one sheet saves rounds of questions.

We fabricate to either code family: ASTM grades and AISC design, or European grades and sections, with mill certificates traced by heat.

Design basis

What the steel design states

The items we confirm with your engineer of record in Sint Maarten before modeling.

ItemWhat we state
Code familyIBC, ASCE 7 and AISC 360, or Eurocode
WindBasic wind speed, exposure, risk category and topographic factor
FloodFloor levels and surge loads set by your engineer
SeismicSite class, spectral values and seismic design category
SteelAISC 341 or the Eurocode equivalent where seismic detailing applies

Who does what

Permit work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Sint Maarten
  • Calculations and drawings for review
  • Answers to plan-review comments on the steel in Sint Maarten
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

In Sint Maarten, the contractor and the engineer of record arrange

  • The VROMI building permit
  • Geotechnical report and site class
  • Inspections on site
  • Foundations
  • Erection

Sint Maarten

What we do not claim

World Steel holds no licence or registration in Sint Maarten and does not apply for permits. The engineer of record approves the design and your team files it with VROMI.

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Sint Maarten has 5 areas. Open Simpson Bay and the Lowlands, Cole Bay or Cul de Sac to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What St. Maartener buyers ask

Who issues building permits in Sint Maarten?

VROMI, the Ministry of Public Housing, Spatial Planning, Environment and Infrastructure. Your team files with the engineer or architect of record.

Can the design follow US codes?

Often yes: many hotel and public projects use the IBC, ASCE 7 and AISC 360 framework. Your engineer of record agrees the basis with the ministry.

Do you supply drawings for the permit?

We supply the steel calculations and drawings your engineer needs. The application itself is made by your team.