Sint Maarten · Ground and earthquakes

Hillside ground and earthquake loads for steel in Sint Maarten

Sint Maarten is a small, hilly island of old volcanic rock and limestone, with steep slopes behind every bay. Flat land is scarce: much of it is fill around Simpson Bay Lagoon and the Great Salt Pond, or sand on the beaches. The island lies on the northern Lesser Antilles arc, where the Atlantic plate dives under the Caribbean plate, so seismic loads are part of the design. Your engineer sets the values; we detail the frame to suit.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Pointe Blanche.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Hills
Steep volcanic rock
Flat land
Fill and sand
Seismic
Lesser Antilles arc
Steel design
AISC 341 where required

Ground types

What lies under the site

Your geotechnical engineer confirms the ground for each site.

AreaTypical groundWhat it means for steel
HillsWeathered volcanic rock on steep slopesStepped bases, rock anchors, slope checks
Lagoon and salt pond edgesFill over soft sedimentsPiles or ground improvement by site
BeachesLoose sandDeeper foundations, scour and surge checks
ValleysClays and alluviumFoundations set by the soil report

Seismic frames

How we detail for earthquakes

Moment frames

Portal and multi-bay frames for warehouses, halls and terminals.

Braced frames

Efficient bracing for hotels, schools and offices.

AWS D1.8 welding

Qualified procedures and welders for demand-critical welds.

Stepped base plates

Base plates and anchors for sloping sites and uplift.

Who does what

Ground and seismic work, split clearly

World Steel supplies

  • Frames detailed to AISC 341 where the design calls for it
  • Column reactions for the foundation design
  • Base plates, anchor bolt plans and templates
  • Plate with EN 10204 3.1 certificates on request
  • Remote or in-person inspector access

In Sint Maarten, the contractor and the engineer of record arrange

  • Geotechnical investigation
  • Site class and seismic design category
  • Retaining walls and foundations
  • Special inspections on site
  • Erection to the drawings

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Sint Maarten has 5 areas. Open Cole Bay, Cul de Sac or Philipsburg to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Row of columns ending in drilled square base plates
Base plates with their bolt holes on a run of columns, World Steel, Vietnam.

Q&A

What St. Maartener buyers ask

Is Sint Maarten at risk from earthquakes?

Yes, from the subduction zone along the Lesser Antilles arc. Design follows the seismic values your engineer sets from the code and the soil report.

Can we build on reclaimed land around the lagoon?

Often yes, with foundations designed for the softer ground. A light steel frame puts less load on it than concrete.

Does a steep lot suit a steel frame?

Yes. Light members and stepped bases suit steep, tight lots, and the frame can be lifted in pieces with small cranes.